My WebLink
|
Help
|
About
|
Sign Out
Home
2018_07-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_07-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 11:02:17 AM
Creation date
7/25/2018 10:52:54 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2018
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />Pathway Master Plan <br />b) partnering with Active Living Ramsey County on comprehensive County <br />pathway mapping <br />3) Trail Heads and Rest Area <br />a) utilizes existing parks w/ restrooms, picnic areas, recreational areas, drinking <br />fountains <br />b) need intermittent rest stops with benches between destinations <br />4) Transit Accommodations <br />a) abundant transit opportunities <br />b) limited and often unsafe pedestrian access to transit stops and park and rides <br />c) bus shelters at bus stops along high traffic roads <br />d) bus benches at many bus stops <br />Current Operation & Maintenance Practices <br />Off -Road Pathways <br />The Parks and Recreation Department and its maintenance staff has the responsibility <br />of making sure routine maintenance operations are completed. On occasion they will <br />request assistance from the street maintenance staff. <br />Listed below are the maintenance operations performed for the City's off-road <br />pathways. <br />• Plowing: Remove any accumulation promptly and continuously until cleared. <br />Accumulation of two inches or more shall be removed within 24 hrs. <br />• Sweeping: Sweep three times annually, spring, summer and fall, or when safety <br />is of concern. <br />• Sealing/ Patching: Fill cracks or holes as they occur. <br />On -Road Pathways <br />The Public Works Department and its maintenance staff are responsible for the <br />maintenance of the on -road pathway facilities on City of Roseville streets. Listed below <br />are the maintenance operations performed for the City's on -road pathways. <br />• Plowing: When there is an accumulation of two inches or more of snow it will be <br />removed within 24 hrs. <br />• Ice control: apply ice control when ice or snow adheres to the pathway. <br />• Sweeping: Sweep three times annually, spring, summer and fall, or when safety <br />is of concern. <br />• Sealing/ Patching: Fill cracks or holes as they occur. <br />On -Road pathways located on County Roads are maintained by Ramsey County. <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.