My WebLink
|
Help
|
About
|
Sign Out
Home
2018_07-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_07-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 11:02:17 AM
Creation date
7/25/2018 10:52:54 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2018
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br />Off -Road Pathways: While a community's streets and roadways typically provide the <br />best means of accessing a variety of destinations by bicycle, off-road pathways can <br />enhance the primary transportation system. Pathways that are separated from the <br />motor vehicle traffic can be excellent transportation routes for bicyclists and <br />pedestrians, especially users not comfortable with riding alongside vehicle traffic, and <br />in many instances, can provide pathway users with linkages not available to motor <br />vehicles. <br />Trail: An off-road pathway that is generally 6-12 feet wide and has a paved <br />bituminous or similar hard surface. Trails are typically located within <br />dedicated right of way, within road right of way separated by a curb and or <br />boulevard, orwithin parks. The surface type and width accommodate multiple <br />users, including pedestrians, bicyclists, and in-line skaters. (Approximately 36 <br />miles) <br />Sidewalk: Concrete sidewalks, usually within the road right of way, generally <br />4-6feetwide and running parallel to the road, intended for use by pedestrians. <br />(Approximately 45 miles) <br />Foot Path: Wood chip trails, ag-lime trails, and turf trails are not <br />considered part of the pathway network because they are exclusive to parks. <br />This document is not about park pathways. They are mentioned for inventory <br />purposes only. (Approximately 2 miles) <br />Other: Boardwalks are not considered part of the pathway network because <br />they are exclusive to parks. This document is not about park pathways. They <br />are mentioned for inventory purposes only. (Approximately 1 mile) <br />Supplemental Facilities <br />Bicycle and pedestrian facilities include more than just the paths themselves. Secure <br />and appropriate bicycle parking and locker facilities, comprehensive maps of <br />Roseville's pathway network, mass transit integration, rest areas, and trailheads are <br />key components of a complete pathway network. Roseville has few supplemental <br />facilities for pathway users. They consist mostly of: <br />1) Bicycle parking and lockers <br />a) bike racks of obsolete design that are sporadically placed in some parks and <br />public buildings <br />b) occasional bike racks located at commercial buildings <br />c) few if any, bike lockers <br />d) current city code does not address the issues of bicycle parking <br />2) Pathways Map <br />a) comprehensive pathways map showing all types of facilities within the City <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.