My WebLink
|
Help
|
About
|
Sign Out
Home
2018_07-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_07-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 11:02:17 AM
Creation date
7/25/2018 10:52:54 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/24/2018
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br />a) The City shall consider pathways as part of the transportation system. <br />b) The City recognizes that residents adjacent to the pathways may not be the <br />only beneficiaries. <br />16) Seek ways to encourage businesses to address bicyclist and pedestrian issues <br />through the redevelopment of their property. <br />a) Provide incentives (low interest loans) for Roseville businesses to redevelop <br />their property with improvements for pedestrians and bicyclists. <br />MAINTENANCE <br />17) Pathways will be kept in good repair and useable. <br />a) During winter, the highest use pathways shall be cleared of snow to bare <br />pavement. <br />b) During winter, the medium use pathways shall be cleared of enough snow to <br />allow passage. <br />c) During winter, the low use pathways will not be cleared of snow. <br />d) Pathways will be cleared within 24 hours after a snowfall. <br />e) All paved pathways shall be swept once during the spring and once during <br />late summer. <br />f) Vegetation encroaching in a pathway corridor shall be trimmed to allow safe <br />passage according to MnDOT standards. <br />g) All pathways and their related facilities shall be inspected annually. <br />Inspection data shall be entered into a management system to help guide the <br />maintenance and replacement decisions. <br />18) Maintenance responsibilities will be assigned based on function and use of the <br />facilities. <br />a) The City will be responsible for all pathway maintenance under City <br />jurisdiction. <br />b) Per City Code, all property owners except taxable properties zoned R-1 or R- <br />2, are required to clear snow from "non -motorized pathways' within 12 <br />hours after snow and ice have ceased to be deposited thereon." (City Code <br />407.03) <br />c) Commercial and institutional property owners will be responsible to clear <br />snow from adjacent pathways when event is 2 inches or greater. <br />19) The City will develop and implement maintenance practices that will minimize <br />the burden on adjoining properties. <br />a) City will minimize property damage during pathway maintenance practices. <br />b) City will reestablish turf damaged as a result of pathway maintenance. <br />c) City will replace or repair mailboxes on City streets damaged by directcontact <br />by City snow removal machinery. <br />d) No more snow will be deposited on private driveways and sidewalks then <br />would be typically deposited by street snow removal. <br />Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.