Laserfiche WebLink
Northern States Power Company, a Minnesota corporation <br />Minneapolis, Minnesota 55401 <br />MINNESOTA ELECTRIC RATE BOOK - MPUC NO. 2 <br />STANDARD CONTRACT FOR <br />SOLAR*REWARDS COMMUNITY (Continued) <br />6. Community Solar Garden Requirements. <br />Section No. 9 <br />2nd Revised Sheet No. 76 <br />A. The Community Solar Garden Operator shall assure that each of the Community Solar Garden Statutory <br />Requirements is met. <br />B. For each Subscriber, there must be a completed and fully -executed Subscriber Agency Agreement and <br />Consent Form (Attachment "A" to this Contract) which is delivered to the Company prior to the Date of Commercial <br />Operation, or prior to adding each Subscriber. <br />C. Code Compliance. The Community Solar Garden Operator shall be responsible for ensuring that the PV <br />System equipment installed at the Community Solar Garden meets all applicable codes, standards, and regulatory <br />requirements at the time of installation and throughout its operation. <br />D. Project Completion. The Company will determine whether an application from the Community Solar <br />Garden Operator is complete within thirty (30) days of its submission to the Company and approve or reject the <br />application based on engineering review within sixty (60) days of finding it complete unless the Community Solar <br />Garden Operator has agreed to an extension. The date an application shall be considered to be submitted to the <br />Company is the date on which the Community Solar Garden Operator has uploaded to the CSG Application System <br />all documents and information to allow the Company to begin engineering review which include the following: <br />(i) the contact information for the Community Solar Garden Operator, <br />(i i) the Community Solar Garden information, including system location and specifications, <br />(iii) application fee and deposit, and, <br />(iv) engineering documents, including one line diagram, site plan and signed Interconnection <br />application. <br />Where the Company has timely rejected an application, the Company will allow the Community Solar Garden <br />Operator to provide additional documents or information and the sixty (60) day timeframe will begin anew for the <br />Company to acceptor reject the application. The Community Solar Garden Operator shall achieve Mechanical <br />Completion of the project within the later of twenty-four (24) months from August 6, 2015 or the Company finding that <br />the application is Expedited Ready. Failure of the Company to meet the timeframes for completing engineering <br />studies and interconnection cost estimates set forth in the Commission's September 28, 2004 Order in Docket No. <br />E999/CI-01-1023 as implemented in Section 10 of the Company's rate book will extend this twenty-four (24) month <br />period on a day -for -day basis. Day -for -day extensions will also be applied to the extent the application is the subject <br />of an Independent Engineer review (Section 9, Sheets 68.11-68.13) or to the extent it is directly delayed as the result <br />of an Independent Engineer review for another application in the same Study Queue. <br />(Continued on Sheet No. 9-76.1) <br />Date Filed: 12-01-16 By: Christopher B. Clark Effective Date: 09-06-16 <br />President, Northern States Power Company, a Minnesota corporation <br />Docket No. E002/M-13-867 Order Date: 09-06-16 <br />C <br />C <br />C <br />C <br />C <br />C <br />