My WebLink
|
Help
|
About
|
Sign Out
Home
2018_08-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_08-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 9:09:33 AM
Creation date
8/31/2018 9:06:02 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/28/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northern States Power Company, a Minnesota corporation <br />Minneapolis, Minnesota 55401 <br />MINNESOTA ELECTRIC RATE BOOK - MPUC NO. 2 <br />STANDARD CONTRACT FOR <br />SOLAR*REWARDS COMMUNITY (Continued) <br />6. Community Solar Garden Requirements. (Continued) <br />Section No. 9 <br />Original Sheet No. 76.1 <br />The 24 -month period shall be tolled day -for -day for a project application that, in the Company's determination, has <br />suffered a Force Majeure event prior to Mechanical Completion. For purposes of this section, Force Majeure means: <br />any act of God, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to <br />machinery or equipment, or any other cause beyond a Party's control, except that a local -government moratorium to <br />issuing a permit may extend the 24 -month period for no more than an additional 6 months. Failure to seek a permit, <br />delay in seeking a permit, or permit -processing time not subject to a moratorium is not included in this extension. An <br />event of Force Majeure does not include an act of negligence or intentional wrongdoing. <br />If Mechanical Completion is not achieved within this twenty-four (24) month period (including any day -for -day <br />extension referenced above), then the Company will return the Deposit and the Community Solar Garden Operator <br />it still intends to proceed with the project, will need to reapply and submit a new application fee and deposit. <br />E. The ADDITIONAL TERMS AND CONDITIONS set forth in tariff Section 9, Sheets 68 through 68.16, <br />fully apply. <br />(Continued on Sheet No. 9-77) <br />Date Filed: 12-01-16 By: Christopher B. Clark Effective Date: 09-06-16 <br />President, Northern States Power Company, a Minnesota corporation <br />Docket No. E002/M-13-867 Order Date: 09-06-16 <br />N <br />N <br />CL <br />
The URL can be used to link to this page
Your browser does not support the video tag.