Laserfiche WebLink
Ramsey County: <br />• County Road C Reconstruction <br />o The County will be reconstructing County Road C between Highway 88 in St <br />Anthony and Long Lake in Roseville in 2019. <br />• A project layout is shown in Appendix C. <br />• Road will be reconstructed with two lanes in each direction. <br />• Road will be concrete pavement. <br />• 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• Signal will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled for spring 2019. <br />Minnesota Department of Transportation updates: <br />• MnDOT's 35W resurfacing project between 4u' St SE in Minneapolis to County Road C <br />in Roseville is underway. Major work and road closures will occur on/off peak hours. <br />o Future lane closures <br />• SB I -35W between 4u' St in Minneapolis and County Road C in Roseville <br />will be closed from Friday, September 21 at 7 p.m. through 11:00 a.m <br />Saturday September 22. <br />• NB 1-35W between 4"' St in Minneapolis and County Road C in Roseville <br />will be closed from Friday, September 21 at 7 p.m. through 8:00 a.m <br />Sunday, September 23. <br />o Additionally the signal light at County Road B and Cleveland Avenue will be <br />replaced with this project. <br />o Work is anticipated to be completed in October. <br />• I -35W MnPASS project - httn://www.dot.state.mn.us/metro/proiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing 1-35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-3 5W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I -35W just north of the County Road C <br />ramps to County Road D. <br />o Road shoulder preparation (fall 2018): Repairing road shoulders and constructing <br />crossovers on 1-35W north of County Road C. <br />o Contract will be awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork will begin Spring 2019. <br />City Council Update: <br />For more information on any of these items please reference the City Council Agenda on <br />the City's website. <br />• <br />Aug. 27"': <br />Approved a Conditional Use Permit (was operating under a three year Interim Use <br />Permit) for Mudslingers Coffee at Lexington and County Road B. <br />Approved a Preliminary Plat at 2237 Cleveland Avenue (northeast quadrant of <br />Cleveland and County Road B) creating five total residential lots. <br />