Laserfiche WebLink
• Sept. 101': <br />o Adopted an interim ordinance temporarily prohibiting drive-throughs in the <br />Neighborhood Business District. <br />o Appointed new members to the Human Rights, Inclusion and Engagement <br />Commission. <br />o Approved a jurisdictional transfer (from Ramsey County to the City of Roseville) <br />for a portion of Roselawn Avenue west of Cleveland Avenue. <br />o Amended a conditional use permit for Chik-Fil-A at the Har Mar Mall. <br />• Sept. 171h: <br />o Directed staff to prepare Agreements for several solar arrays on City Campus <br />rooftops and return to the City Council on October 22°d for final approval. <br />• Sept. 241' (planned): <br />o Considering names for the new Parks located at Cleveland Avenue and County <br />Road B and at 1716 Marion Street (just north of Larpenteur Avenue) <br />o Adopting a preliminary 2019 City Tax Levy and Budget <br />o Considering the Final Layout for the County Road C Reconstruction Project <br />Major Maintenance Activities: <br />• Crews completed all site work at the new Cleveland Park at Cleveland Avenue and <br />County Road B and the new Marion Park. <br />• Reclamation and grading of pathway on the north side Bennett Lake from fishing pier to <br />Waterfall. Paving will occur in the next few weeks. <br />• Completed 6th mowing of Street R.O.W. areas. <br />• Ongoing Street patching, and spray patching. <br />• Completed pavement crack sealing. <br />• Ongoing weeding and maintaining City Streetscape areas including irrigation repairs. <br />• Ongoing compost deliveries, and site maintenance. <br />• Ongoing catch basin and manhole repairs. <br />• Ongoing street sign work. <br />• Continue cleaning sanitary sewer mains. <br />• Completed flushing private hydrants. <br />• Painted hydrants. <br />• Valve exercising. Turning large valves 12"-20" water main. (New valve turning machine <br />is in service.) <br />• Collected water samples for bacteriological testing and disinfectant by-products. <br />• Completed bi-weekly sanitary sewer flow readings. <br />• Weekly lift station inspections. <br />• Responded to over 30 service requests for sewer/water related issues. <br />• Continued replacing water meter heads and radios. <br />• Continued working with engineers and contractors on the 2018 PMP, the Booster Station <br />Phases 1 & 2 projects, the Lounge, Walsh Pond and Femwood Lift Station projects. <br />• Continue to collect I/I flow data at 10 locations every two weeks. <br />Attachments: <br />A: 2018 Project Map <br />B: September Development Activity Report <br />C: County Road C Preliminary Layout <br />D: I -35W MnPass Layout (County Road C — County Road D section only) <br />