My WebLink
|
Help
|
About
|
Sign Out
Home
2018_11-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_11-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 10:49:01 AM
Creation date
11/29/2018 10:46:26 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/27/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The County will be reconstructing County Road C between Highway 88 in St <br />Anthony and Long Lake in Roseville in 2019. <br />• Road will be reconstructed with two lanes in each direction. <br />• Road will be concrete pavement. <br />• 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• Signal will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled for spring 2019. <br />Minnesota Department of Transportation updates: <br />• MnDOT's 35W resurfacing project between 4d' Street SE in Minneapolis to County Road <br />C in Roseville is underway. Major work and road closures will occur on/off peak hours. <br />o Additionally the signal light at County Road B and Cleveland Avenue will be <br />replaced with this project. <br />• The signal replacement has been delayed due to materials not being <br />available. <br />• I -35W MnPASS project - httn://www.dot.state.mn.us/metro/nroiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing 1-35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-3 5W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I -35W just north of the County Road C <br />ramps to County Road D. <br />o Road shoulder preparation (fall 2018): Repairing road shoulders and constructing <br />crossovers on 1-35W north of County Road C. <br />o Contract will be awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major road work will begin Spring 2019. <br />City Council Update: <br />For more information on any of these items please reference the City Council Agenda on <br />the City's website. <br />• Oct 22: <br />o Approved Solar system Agreements for the Civic Campus <br />o Discussed Snow Event Parking Restrictions — recommended increased <br />communications and more outreach to apartment buildings. May consider a Snow <br />Emergency addition to our ordinance in 2019. <br />Nov 6d': <br />The City Council reviewed the proposed 2019 Utility Rates and changes to the <br />Fee Schedule. It is expected that they will adopt both without changes on <br />December 3`d when the overall budget levy is approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.