My WebLink
|
Help
|
About
|
Sign Out
Home
2018_11-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_11-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 10:49:01 AM
Creation date
11/29/2018 10:46:26 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/27/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Major Maintenance Activities: <br />• Assisted Water Utilities with four waterbreaks. <br />• Street department completed patches and temporary concrete curb. <br />• Completed black dirt and hydro seeding along recently resurfaced pathways in Langton <br />Lake Park and Central Park. <br />• Ongoing street patching and spray patching. <br />• Ongoing Compost site maintenance. <br />• Ongoing sign repairs. <br />• Ongoing Misc. tree trimming. <br />• Ongoing leaf vacuuming and sweeping. About one-third completed. <br />• 11/8/18 Anti -iced anticipated the 1" snowfall on 11/9. <br />• 11/9 plowed collectors and treated streets; one of the earliest in many years! <br />• Completed the 2018 sanitary sewer cleaning program. <br />• Repaired 5 broken water mains. <br />• Collected water samples for bacteriological testing. <br />• Completed exercising all large water valves 12" and larger. <br />• Continued replacing meter heads and radios. <br />• Completed work on the Lounge and Walsh Pond lift stations. <br />• Continued working with architect and contractors on the Willow Room remodeling <br />proj ect. <br />• Completed collecting UI flow data in 10 manholes every two weeks for the year. <br />Attachments: <br />A: 2018 Project Map <br />B: November Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.