Laserfiche WebLink
Major Maintenance Activities: <br />• Assisted Water Utilities with four waterbreaks. <br />• Street department completed patches and temporary concrete curb. <br />• Completed black dirt and hydro seeding along recently resurfaced pathways in Langton <br />Lake Park and Central Park. <br />• Ongoing street patching and spray patching. <br />• Ongoing Compost site maintenance. <br />• Ongoing sign repairs. <br />• Ongoing Misc. tree trimming. <br />• Ongoing leaf vacuuming and sweeping. About one-third completed. <br />• 11/8/18 Anti -iced anticipated the 1" snowfall on 11/9. <br />• 11/9 plowed collectors and treated streets; one of the earliest in many years! <br />• Completed the 2018 sanitary sewer cleaning program. <br />• Repaired 5 broken water mains. <br />• Collected water samples for bacteriological testing. <br />• Completed exercising all large water valves 12" and larger. <br />• Continued replacing meter heads and radios. <br />• Completed work on the Lounge and Walsh Pond lift stations. <br />• Continued working with architect and contractors on the Willow Room remodeling <br />proj ect. <br />• Completed collecting UI flow data in 10 manholes every two weeks for the year. <br />Attachments: <br />A: 2018 Project Map <br />B: November Development Activity Report <br />