My WebLink
|
Help
|
About
|
Sign Out
Home
2018-11-1_PR_Comm_Min
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2018
>
2018-11-1_PR_Comm_Min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2018 8:06:26 PM
Creation date
12/4/2018 8:06:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ROSEVILLE PARKS AND RECREATION COMMISSION <br />MEETING MINUTES FOR <br />November 1, 2018 6:30 p.m. <br />PRESENT:Baggenstoss, Bole,Heikkila,Hoag,O’Brien,Stoner <br />ABSENT:Gelbach, Newby, Quick, Warzecha <br />STAFF: Brokke, Christensen <br /> <br />1) INTRODUCTIONS <br /> <br />2) ROLL CALL/PUBLIC COMMENT <br /> <br />3) APPROVAL OF MINUTES – OCTOBER 2, 2018 MEETING <br />Commissioner Hoag moved to approve the October 2, 2018 meeting minutes. Commissioner <br />Bole seconded. Motion passed unanimously. <br /> <br />4) GUIDANT JOHN ROSE MINNESOTA OVAL CONDITION ASSESSMENT <br />REVIEW <br />Commissioner Stoner asked for confirmation that the initial engineer responsible for the <br />OVAL design was the person who conducted the assessment for Stantec. Staff confirmed. <br /> <br />Staff introduced the history of improvements at the Guidant John Rose Minnesota OVAL <br />(OVAL) since opening in 1993 (25 years ago). Due to the regional and beyond nature of the <br />OVAL, the capital costs havebeen a joint effort between the State of Minnesota, general <br />contributions and the OVAL user groups. The city has been responsible for the annual <br />operating costs. <br /> <br />The city commissioned Stantec to complete the Condition Assessment Report in order to <br />helpbetter understand the needs, cost estimates and priorities forthe mechanicalcomponents <br />and infrastructureofthe OVAL. <br />Staff provided a photo tour from the OVAL ConditionAssessment Report. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.