Laserfiche WebLink
City of Roseville 2019 Fee Schedule <br /> Permit and Plan/Project Review Fees (continued) <br /> City 2018 2019 <br /> Fee Description Code Amount Amount Comments <br /> House Moving Permit Fee: <br /> Over private property only $ 95.00 $ 95.00 <br /> Over public streets 137.00 137.00 <br /> Investigation fee(hourly) 70.00 70.00 <br /> Manufactured Home Permit Fee(new installation) 275.00 275.00 <br /> Mechanical Permit Fee-Residential: <br /> Air conditioning: replacement 61.00 61.00 <br /> Warm air furnace: new - - Eliminated in 2018 <br /> Warm air furnace: replacement 61.00 61.00 <br /> Hot water boilers: new - - Eliminated in 2018 <br /> Hot water boilers: replacement 61.00 61.00 <br /> Unit heaters 61.00 61.00 <br /> Swimming pool heaters 61.00 61.00 <br /> New construction,misc. work& gas piping 1.28%of job cost $61.00 minimum fee <br /> Minimum fee 61.00 61.00 <br /> Gas fireplace 61.00 61.00 <br /> In floor heat 85.00 85.00 <br /> Mechanical Permit Fee- Commercial (All) 1.28%of job cost Plus $61.00 <br /> Plan Review Fee: 65% 65% %of permit fee <br /> Plumbing Permit Fee: Residential <br /> Minimum fee 61.00 61.00 <br /> Additional for each fixture opening 10.00 10.00 <br /> Backflow prevention device 10.00 10.00 <br /> Miscellaneous work 1.28%of job cost <br /> Plumbing Permit Fee: Commercial <br /> Minimum fee 1.28%of job cost Plus $61.00 <br /> Plan Review Fee 65%of permit fee <br /> Sewer Connection Permit Fee-Community Develop: <br /> Residential $ 96.00 $ 96.00 <br /> Commercial 303.00 303.00 <br /> Repair 61.00 61.00 <br /> Disconnect: residential 85.00 85.00 <br /> Disconnect: commercial 169.00 169.00 <br /> Sewer Connection/Inspection Permit Fee-Engineering: <br /> Connection: residential 25.00 25.00 <br /> Connection: commercial 75.00 75.00 <br /> Connection: repair 25.00 25.00 <br /> Connection: inspection 75.00 75.00 <br /> Disconnect: residential 25.00 25.00 <br /> Disconnect: commercial 75.00 75.00 <br /> 13 <br />