Laserfiche WebLink
City of Roseville 2019 Fee Schedule <br /> Permit and Plan/Project Review Fees (continued) <br /> City 2018 2019 <br /> Fee Description Code Amount Amount Comments <br /> Sign Permit Fee -Community Development: <br /> Permanent sign(minimum fee) 55.00 Per Building Permit Fee Sched. ($55 min fee) <br /> Annual sign 100.00 100.00 <br /> Temporary sign 30.00 30.00 <br /> Attention-getting device 30.00 30.00 <br /> Swimming Pool Permit-Community Development: <br /> Residential: in-ground 212.00 212.00 <br /> Residential: seasonal 25.00 25.00 <br /> Commercial Per Building Permit Fee Schedule <br /> Swimming Pool Permit-Engineering 15.00 15.00 <br /> Water Connection Permit Fee-Community Develop: <br /> Residential 96.00 96.00 <br /> Commercial 303.00 303.00 <br /> Repair 61.00 61.00 <br /> Disconnect: residential 85.00 85.00 <br /> Disconnect: commercial 169.00 169.00 <br /> Water Connection/Inspection Permit Fee-Engineering: <br /> Connection: residential 25.00 25.00 <br /> Connection: commercial 75.00 75.00 <br /> Connection: repair 25.00 25.00 <br /> Connection: inspection 75.00 75.00 <br /> Disconnect: residential 25.00 25.00 <br /> Disconnect: commercial 75.00 75.00 <br /> Water Meter Program Fees-Engineering: <br /> Manual meter read surcharge 20.00 20.00 per quarter <br /> Non-standard water meter no-read fee 50.00 50.00 <br /> Denial of access to water meter 100.00 100.00 per quarter <br /> Utility Disconnect Fee n/a 5,000.00 <br /> 14 <br />