My WebLink
|
Help
|
About
|
Sign Out
Home
2019-1-3_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2019
>
2019-1-3_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 3:28:13 PM
Creation date
12/27/2018 3:28:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Improvement Plan: <br /> Fencing maintenance annually per industry standards. Consists of <br />repairing direct damage issues, curling of bottom areas and other <br />larger maintenance items <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Foul ball and safety netting replacements on 10 year interval per <br />industry standards. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Outfield/sod maintenance annually per industry standards. Consists of <br />regrading minor uneven areas and sod replacement. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Infield maintenance annually per industry standards. Consists of <br />regarding uneven areas and adjusting aglime depth. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Irrigation maintenance annually per industry standards. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Lighting maintenance annually per industry standards. Consists of <br />bulb and ballast replacements. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br />Capital Improvement Plan: <br /> Full field update on 5 year intervals per industry standards. Full <br />regrade and resurface field as needed. Major uneven areas including <br />new sod and aglime as needed. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Fencing upgrade on 10 year intervals per industry standard. Includes <br />fabric and post replacement as needed. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> Full rebuild on 30 year intervals. Includes full replacement of all of <br />the above items and dugouts, irrigation, and all site amenities. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br /> <br />5.6 Garden and other irrigation systems: <br /> <br />Condition Rank Description of Condition <br />8 <br />14 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.