My WebLink
|
Help
|
About
|
Sign Out
Home
2019-1-3_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2019
>
2019-1-3_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 3:28:13 PM
Creation date
12/27/2018 3:28:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Very good condition – brand new – only <br />normal maintenance required <br />2Good condition – minor defects only, minor <br />maintenance required (5%) <br />3Moderate condition – significant <br />maintenance required to return to accepted <br />level of service (10-20%) <br />4Poor condition – requires renewal, <br />significant renewal/upgrade required (20- <br />50%) <br />5Very poor condition – asset unserviceable, <br />over 50% of asset requires replacement <br />Industry useful life of irrigation systems 20 years <br />Industry useful life of gardens ?? <br />Capital Improvement Plan <br /> Full replacement on 30 year interval per industry standard. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br />5.7 Bridges and boardwalks: <br /> <br />Condition Rank Description of Condition <br />1 Very good condition – brand new – only <br />normal maintenance required <br />2Good condition – minor defects only, minor <br />maintenance required (5%) <br />3Moderate condition – significant <br />maintenance required to return to accepted <br />level of service (10-20%) <br />4Poor condition – requires renewal, <br />significant renewal/upgrade required (20- <br />50%) <br />5Very poor condition – asset unserviceable, <br />over 50% of asset requires replacement <br />Industry useful life 12 years <br />Capital Improvement Plan <br /> Full replacement on 30 year interval per industry standard. <br />o Inspection by staff bi-annually spring and fall. Adjust interval <br />according to inspection program. <br />9 <br />15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.