Laserfiche WebLink
• 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• Signal will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled for spring 2019. <br />Minnesota Department of Transportation updates: <br />• I -35W MnPASS project - http://www.dot.state.mn.us/metro/projects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing 1-35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-3 5W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I -35W just north of the County Road C <br />ramps to County Road D. <br />o Road shoulder preparation (Fall 2018): Repairing road shoulders and constructing <br />crossovers on 1-35W north of County Road C. <br />o Contract will be awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork will begin Spring 2019. <br />• Work will begin on southbound lanes in 2019 with ramp closures this <br />summer for southbound County Road C and southbound County Road D. <br />Miscellaneous Updates: <br />• Campus Solar <br />o iDeal Energies started construction on the Solar PV System on January 14 for <br />City Hall and the Fire Station. The first phase (DC components) of the project <br />includes setting up the racking and the solar panels, and should be complete by <br />January 18. The second phase (AC Components) will consist of connecting the <br />solar panels to the City's electrical system/meter, and this will also take <br />approximately 1 week. Xcel Energy will inspect the project 4-6 weeks after the <br />AC work is complete, which could make the system operational in March or <br />April. The Public Works Solar PV System is still in the design and permitting <br />phase. <br />Commercial Water Usage Analysis <br />o Last year the Commission reviewed the water data and tiered rate structure for <br />residential properties. The Commission asked staff to look into the commercial <br />water data to see if the rate structure needed to be modified. Attachment C is a <br />summary of the commercial water data from the last four years. Staff will present <br />the data in more detail for Commission discussion at the February meeting. Staff <br />would recommend the commission review the data and indicate to staff if any <br />additional data is needed prior to the February commission meeting. <br />City Council Update: <br />For more information on any of these items please reference the City Council Agenda on <br />the City's website. <br />• January 14: <br />