My WebLink
|
Help
|
About
|
Sign Out
Home
2019_01-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_01-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:04:30 PM
Creation date
2/1/2019 1:56:27 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/22/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Maintenance Facility Report <br />Scheme A: New Mezzanines + Off -Site Storage <br />102617.13 <br />In Scheme A, 1,700 SF of 5'-0" deep mezzanines will <br />be added along three walls of the main vehicle <br />storage garage. The shallow mezzanines will be <br />supported by a secondary structure of columns <br />inside the existing precast walls. Most vehicles will <br />still be able to pull in below the mezzanines. The <br />mezzanines can be accessed by fork lift. <br />C An additional 2,900 SF of mezzanine storage will be <br />added in the North Vehicle Storage. This addition <br />extends the existing mezzanine across all north parking stalls. The mezzanine allows 9'-0" of <br />clearance, enough to park pick-up trucks below. The deep mezzanine can accommodate <br />seasonal storage and excess equipment. <br />The mezzanine additions of Scheme A do not improve vehicle storage onsite. Scheme A does not <br />improve the already too small yard and it doesn't account for future growth. <br />If no changes are made to the existing facility, the Public Works and Parks & Recreation <br />departments will still require an additional 18,000 SF of equipment and seasonal storage. To <br />store the remaining vehicles and equipment, the City of Roseville could either purchase or build <br />a storage facility. <br />Pros <br />Cons <br />4,600 SF total additional Mezzanines No additional on-site Vehicle Storage <br />Least expensive solution Requires 18,000 SF off-site Storage <br />Easily Implemented Rotate seasonal storage twice a year <br />No alterations to the surrounding site Yard remains too small for existing needs <br />Does not accommodate future growth <br />Additions to Existing Building & Site $ 365,000 - $ 451,000 <br />New Building Site (Off -Site Storage)* $3,519,000 - $4,830,000 <br />Soft Costs (Primarily for New Building) $ 232,200 - $ 302,100 <br />Total Estimate $4,200,000 - $5,600,000 <br />*Cost estimate does not include the cost of land acquisition. <br />KODETARCHITECTURAL GROUP, LTD. 15 Groveland Terrace, Minneapolis, MN 55403+1154 T: (612) 377 -2737 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.