My WebLink
|
Help
|
About
|
Sign Out
Home
2019-1-3_PR_Comm_Min
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2019
>
2019-1-3_PR_Comm_Min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 2:44:54 PM
Creation date
2/11/2019 2:44:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ROSEVILLE PARKS AND RECREATION COMMISSION <br />MEETING MINUTES FOR <br />January 3, 2019 6:30p.m. <br />PRESENT:Baggenstoss,Gelbach,Heikkila,Hoag,O’Brien,Stoner, Warzecha <br />ABSENT:Bole, Newby, Quick <br />STAFF: Brokke, Christensen, Taylor <br />1) INTRODUCTIONS <br />2) ROLL CALL/PUBLIC COMMENT <br /> <br />3) APPROVAL OF MINUTES – DECEMBER 4, 2018 MEETING <br />Commissioner Hoagmoved to approve the December 4, 2018meeting minutes. <br />Commissioner Warzecha seconded. Motion passed unanimously. <br /> <br />4) DISCUSS 2019 DRAFT PROJECT AREAS AND APPROACH <br />Staff introduced the 2019 draft project areas and approach. The program focuses on taking <br />care of existing assets, preplanning in advance for repairs/replacements andsharing <br />information. Each project is separated into three areas depending on price and scope, the Park <br />Improvement Program (PIP) is for mid-range budget items, the Capital Improvement <br />Program(CIP) includes major replacement items and the daily maintenance items fall under <br />the Park Maintenance Operational (PM) area. <br />The 2019 draft Park Improvement Program (PIP) project areasinclude: <br />Playground safety surfaces at Applewood, Central Park (Victoria East), Howard <br />Johnson, Langton Lake North, Central Park (Dale Street), Sandcastle, Acorn, Central <br />Park (Foundation) <br />Tennis and basketball courts crack seal and color at Owasso Hills, Pioneer, Valley <br />and Veterans Parks <br />Fencing projects atLangton Lake, Oasis, and Lexingtonbackstop <br /> Facility improvements to the Harriet Alexander Nature Center (HANC) wall <br />Landscape mulch <br />Replacementand/orrepairing ofgrills, drinking fountains, picnic tables, benchesand <br />soccer goals <br /> Ag lime pathways/ballfield at Owasso Ballfields and Acorn Park <br /> Sign Program (replace and updated outdated or worn signs) <br />Landscaping and site work at Autumn Grove South, Legion Basketball Field, Central <br />Park Victoria, Rosebrook and Lexington <br /> <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.