My WebLink
|
Help
|
About
|
Sign Out
Home
2019_02-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_02-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 9:22:39 AM
Creation date
2/25/2019 12:05:39 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/26/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: February 26, 2019 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 2 <br />Item No: 4 <br />o The contract for this project was awarded on July 23, 2018. <br />o Work will continue through summer of 2019. <br />o Work includes HVAC upgrades, electrical upgrades including creation of an <br />electrical room, security upgrades, replacement of two pumps and replacement of <br />some underground piping and valves. <br />o Work on this phase is approximately 30% completed. <br />• 2018 Sewer CIPP <br />o This project involves lining 6.0 miles of sanitary sewer pipe and two small <br />segments of storm sewer. This project is approximately 85% complete with the <br />project scheduled to be completed by the end of March. <br />• 2019 Sewer CIPP <br />o The 2019 project involved 4.8 miles of sanitary sewer pipe and one small segment <br />of storm sewer. The project is approximately 20% complete. All work is <br />scheduled to be completed by September. <br />• Fernwood Lift Station <br />The City's consultant is currently designing plans and specifications for this <br />sanitary sewer lift station rehabilitation. Work on the lift station will likely begin <br />Spring of 2019. <br />Metropolitan Council Environmental Services updates: <br />• Avon street <br />o This project is essentially complete. The final lift of pavement will be placed this <br />spring. <br />Upper Villa <br />o This project is essentially complete. Final cleanup and restoration will occur in <br />the spring. <br />• County Road 88 & Long Lake Road <br />o Crews have mobilized to the project site. Works consists of CIPP lining the sewer <br />main. Work on this site is scheduled to be substantially completed by the end of <br />July 2019. <br />Ramsey County: <br />• County Road C Reconstruction <br />o The County will be reconstructing County Road C between Highway 88 in St <br />Anthony and Long Lake in Roseville in 2019. <br />• Road will be reconstructed with two lanes in each direction. <br />0 Road will be concrete pavement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.