• 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• Signal will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled for spring 2019. <br />Minnesota Department of Transportation updates: <br />• I -35W MnPASS project - htty://www.dot.state.mn.us/metro/proiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing 1-35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-3 5W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I -35W just north of the County Road C <br />ramps to County Road D. <br />o Road shoulder preparation (Fall 2018): Repairing road shoulders and constructing <br />crossovers on 1-35W north of County Road C. <br />o Contract was awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork will begin Spring 2019. <br />• Work will begin on southbound lanes in 2019 with ramp closures this <br />summer for southbound County Road C and southbound County Road D. <br />Miscellaneous Updates: <br />• Campus Solar <br />o iDeal Energies started construction on the Solar PV System on January 14 for <br />City Hall and the Fire Station. The first phase (DC components) of the project <br />was completed in late January and included setting up the racking and the solar <br />panels. The second phase (AC Components) consists of connecting the solar <br />panels to the City's electrical meter. Currently the conduits are run from the solar <br />panels to the meter locations, and the actual connection to the meters will take <br />place over the next two weeks. After the meters are connected, Neel Energy will <br />inspect the project 4-6 weeks later which will put the anticipated approval of the <br />Solar PV in April or May. The Public Works Solar PV System is still being <br />designed and permitted. <br />• Complete Streets Policy <br />o In November staff presented a complete streets policy to the commission. Based <br />on feedback that staff received, we made the changes recommended by the <br />commission. The final draft document is enclosed as attachment C. Staff plans to <br />present this to Council this spring for final adoption. <br />• Organics Drop off Site <br />o Staff is working with Ramsey County to finalize an agreement for the <br />construction, operation and maintenance of an organics drop off site at the City's <br />Leaf Recycling Center located on Dale Street south of County Road C. Staff <br />anticipates bringing this agreement to the City Council this spring with actual <br />construction of the site occurring this summer. <br />