Laserfiche WebLink
27 The RosevilleÓs Development Review Committee (DRC) met on January 31, 2019, to review the <br />28 proposed subdivision plans. Below are the comments based on the DRCÓs review of the <br />29 application: <br />30 Dimensional Standards <br />31 Although the current zoning of the subject property is LDR-2, the design of the four lots achieve <br />32 compliance with the LDR-1 standards for lot width, depth and square footage. <br />33 Easements <br />34 The drainage and utility easements shown at the margins of the proposed parcels meet or exceed <br />35 the10-foot width requirement established in §1103.03 of the Subdivision Code. Most of the <br />36 easements are shown at 12 feet wide, and those may be reduced unless the approved drainage <br />37 and storm water mitigation plans rely on the easements as proposed. There is also a utility and <br />38 drainage easement for the utilities under the private road; a utility and drainage easement for the <br />39 storm water management pond; and a pre-existing utility and drainage easement bisects the <br />40 norther portion of Lots 2 and 5. <br />41 Tree Preservation <br />42 The tree inventory of the subject platted area has been submitted for staff review. The Planning <br />43 Division and the applicant are working on the preservation plan in an effort to save as many trees <br />44 along the periphery as possible. To that point, most trees adjacent to the existing retaining wall <br />45 at the corner of Williams and North McCarrons will need to be removed due to necessary <br />46 grading, as will some of the trees from the corner to the private street adjacent to Williams. A <br />47 similar situation exists adjacent the storm management pond where most of the trees will be <br />48 removed. The remaining periphery trees will be further analyzed and those deemed hearty, will <br />49 be preserved. Most remaining trees on the interior, where homes and the private drive are to be <br />50 constructed, are planned to be removed. Once the plan is finalized, the CityÓs tree consultant <br />51 will review for consistency with the tree preservation plan requirements. <br />52 Stormwater Management <br />53 The plat addresses the assumed level of development on the proposed lots as required. The <br />54 grading and stormwater management plan reviewed with the plat proposal is not intended to be <br />55 approved with the plat as the final plan. Instead, the plans reviewed with a plat proposal are <br />56 intended to demonstrate that the standard City Code requirements pertaining to grading and <br />57 stormwater management can be met as the proposed project is implemented. The Engineering <br />58 Deptartment will continue to work with the developer to finalize the grading and stormwater <br />59 management for the proposed development. <br />60 Park Dedication <br />61 This subdivision proposal triggers a park dedication requirement because the subject property <br />62 includes four new lots and the new platted lots are over an acre. The Park and Recreation <br />63 Commission will consider the Park Dedication requirement on Tuesday, February 5, 2019, for <br />64 which staff will provide the Commission with their recommendation at the meeting. It is <br />65 anticipated that the requirement will be payment in lieu of land dedication in the amount of <br />66 $4,000 per lot. <br />67 P UBLIC C OMMENT <br />68 At the time this RPCA was prepared, Planning Division staff has not received any comments or <br />69 questions about the proposed plat. <br />PF18-016_RPCA_MajorPlat_020619 <br />Page 3 of 4 <br /> <br />