My WebLink
|
Help
|
About
|
Sign Out
Home
2019_05-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_05-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 8:29:30 AM
Creation date
5/30/2019 8:26:33 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Crews have mobilized to the project site. Works consists of CIPP lining the sewer <br />main. Work on this site is scheduled to be substantially completed by the end of <br />July 2019. <br />Ramsey County: <br />• County Road C Reconstruction: Hwy 88 to Long Lake Road <br />o The County will be reconstructing County Road C between Highway 88 in St. <br />Anthony and Long Lake Road in Roseville in 2019. <br />• County Road C will be reconstructed with two lanes in each direction with <br />concrete pavement <br />• An 8 foot bituminous pathway will be constructed on the south side of the <br />road. <br />• The traffic signals will be replaced at Long Lake Road and Walnut Street. <br />• Additional turn lanes will be added on Long Lake Road. <br />• Railroad crossing will be replaced and new signals and gates will be <br />constructed. <br />• Upgraded storm sewer. <br />• Minimal water and sanitary sewer replacement. <br />• Work is scheduled to begin in June 3. <br />County Road C Concrete Rehabilitation: Cleveland Ave to Snelling Ave <br />o Work includes concrete maintenance on County C between Cleveland Avenue <br />and Snelling Avenue. Work includes ADA upgrades and concrete joint repairs. <br />o Work is scheduled to take place starting in June and go through mid-July. <br />Minnesota Department of Transportation updates: <br />• I-35WMnPASSproject-httn://www.dot.state.nm.us/metro/vroiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing I -35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-35W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area. <br />o Install noise walls on the east side of 1-35W just north of the County Road C <br />ramps to County Road D. <br />o Contract was awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork will begin Spring 2019. <br />• Work will begin on southbound lanes in 2019 with ramp closures this <br />summer for southbound County Road C and southbound County Road D. <br />• The southbound TH 51 (Snelling Avenue) turn lane to southbound <br />Hamline will be closed for the remainder of the project. <br />• In early June, all traffic will be shifted to the northbound lanes with two <br />through lanes in each direction. <br />• In early July, the County Road C bridge will be removed. <br />Miscellaneous Updates: <br />• Organics Drop off Site <br />o Staff is working with Ramsey County to finalize an agreement for the <br />construction, operation and maintenance of an organics drop off site at the City's <br />Leaf Recycling Center located on Dale Street south of County Road C. Staff <br />anticipates bringing this agreement to the City Council this spring with actual <br />construction of the site occurring this summer. <br />