Laserfiche WebLink
o This project is essentially complete. All restoration will be finalized by the end of <br />July. <br />• County Road 88 & Long Lake Road <br />o All restoration will be finalized by the end of July. <br />Ramsey County: <br />• County Road C Reconstruction: Hwy 88 to Long Lake Road <br />o The County will be reconstructing County Road C between Highway 88 in St. <br />Anthony and Long Lake Road in Roseville in 2019. <br />o Work is underway with traffic down to one lane in each direction. <br />o County Road C will be closed at the railroad for replacement of the tracks starting <br />June 24 -June 28. Detours will be set up <br />• County Road C Concrete Rehabilitation: Cleveland Ave to Snelling Ave <br />o Work includes concrete maintenance on County C between Cleveland Avenue <br />and Snelling Avenue. Work includes ADA upgrades and concrete joint repairs. <br />o Work is currently ongoing with traffic down to one lane in each direction. Work <br />is scheduled to go through mid-July. <br />Lexington Avenue Resurfacing, County Road C2 to County Road E <br />o The County is finalizing storm sewer repairs and curb upgrades. Work for this <br />portion of the project should be completed the week of June 24. <br />o The mill and overlay portion of the project will take place later this summer. <br />Minnesota Department of Transportation updates: <br />• I -35W MnPASS project - httn://www.dot.state.mn.us/metro/vroiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing I -35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave 1-35W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area. <br />o Install noise walls on the east side of 1-35W just north of the County Road C <br />ramps to County Road D. <br />o Contract was awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major roadwork is underway. <br />• The southbound TH 51 (Snelling Avenue) turn lane to southbound <br />Hamline will be closed for the remainder of the project. <br />• All traffic is shifted to the northbound lanes with two through lanes in <br />each direction. <br />• Starting Wednesday June 26 through November, the SB 1-35 ramps to <br />County road C will be closed. <br />• From the evening of June 28- the morning of July 1, County Road C will <br />be closed for related bridge work. <br />• Rosegate Avenue will be closed through November starting July 1. <br />Miscellaneous Updates: <br />• Campus Solar <br />The City Hall and Fire Station Solar PV Systems have been operational since <br />April. To date, the two systems have produced over 25MWh's of energy, which <br />is approximately 12% of our energy needs for the two buildings. <br />The Maintenance Building Solar PV System was completed and has passed the <br />necessary testing. The final step is for Neel to install the bi-directional meter, <br />which should be within the next month. Once that is installed, the system will be <br />