My WebLink
|
Help
|
About
|
Sign Out
Home
2019_06-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_06-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 10:26:31 AM
Creation date
6/27/2019 10:24:16 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/25/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />65 <br />66 <br />67 <br />68 <br />69 <br />70 <br />71 <br />72 <br />73 <br />74 <br />75 <br />76 <br />77 <br />78 <br />79 <br />Chair Cihacek swore in Commissioner Shane Spencer as the newest Commissioner <br />to the PWETC. <br />Member Spencer shared his background with the Commission. <br />4. Approval of April 23, 2019 Meeting Minutes <br />Comments and corrections to draft minutes had been submitted by PWETC <br />commissioners prior to tonight's meeting and those revisions incorporated into the <br />draft presented in meeting materials. <br />5. <br />Motion A& <br />Vice Chair Wozniak moved, Member Hammer seconded, approval of the <br />April 23, 2019 meeting minutes as presented. <br />Ayes: 6 <br />Nays: 0 <br />Motion carried. <br />Communication Items <br />City Engineer Jesse Freihammer provided a brief review and update <br />and maintenance activities listed in the staff report dated May 28, 2019 <br />on proj ects <br />Vice Chair Wozniak noticed the County has implementephase signals at Hamlin <br />where it crosses County Road B2 and has seen some long 'nes of traffic eastbound <br />in the afternoon. <br />qw <br />Mr. Freihamm tate ff can wo ith the County on possibly adjusting the <br />e. <br />Vice Chair Wozniak noted the roa goes down to one lane after the lights with a <br />left turn lane and he thought the turn lane could be made a little longer but was not <br />sure what the solution would be. He wondered how adjustable the signals are. <br />Mr. Freihammer stated the length of the signal can be adjusted. <br />Vice Chair Wozniak asked if the signal can be triggered by sensors. <br />Mr. Freihammer ated the signals can have sensors that trigger timing but most of <br />the time it is triggered by cars, based by the loop detectors and then goes to a cycle. <br />Member Huiett asked with the construction contracts are there diversity goals <br />within the subcontractors. <br />Mr. Freihammer stated if the project is Federal Aid those are automatically built in. <br />For the MnDOT projects for this year have prevailing wage goals in there and are <br />some requirements. <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.