My WebLink
|
Help
|
About
|
Sign Out
Home
2019_07-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_07-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 12:23:09 PM
Creation date
7/19/2019 12:21:40 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/23/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Approved resolution prohibiting parking on Larpenteur Avenue between Dale <br />Street and Rice Street <br />Major Maintenance Activities: <br />• Street and Storm <br />o Assisted Ramsey County in patching their roads prior to Rosefest events. <br />o Pre and post sweep of parking lots and streets (both County and City) for Rosefest <br />events. <br />o Provided equipment and staff for perimeter security for Rosefest parade. <br />o Provided staff and equipment for Rosefest touch a truck event. <br />o Completed second sweep <br />o Ongoing Streetscape maintenance. Weeding, pruning. <br />o Started 4th mow. <br />o Re -painting of message pavement markings completed. <br />o Ongoing repair of failed catch basins. <br />o Ongoing mill and patching of delamination streets. <br />o Ongoing spray injection patching of delamination streets. <br />o Ongoing compost turning continuing Friday. Deliveries of compost. <br />o Ongoing sign repair and installs. <br />o Some tree trimming. Minor wind related limbs down. <br />o Ongoing debris clearing of pond inlets and outlets related to continual rainfall. <br />Water and Sanitary Sewer <br />o Continued collecting sanitary sewer flow data every other Friday <br />o Completed flushing and inspecting private hydrants <br />o Began the 2019 public hydrant painting program <br />o Continued the 2019 Sanitary Sewer Cleaning program <br />o Completed and distributed the 2018 Consumer Confidence Report <br />o Collected water samples for bacteriological and disinfectant by-product testing <br />o Continued replacing meter heads and radios <br />o Continued working with engineers and contractors on the Booster Station Phase 2 <br />project <br />o Continued working with city engineers and consulting engineers on the Fernwood <br />lift station project <br />o Continued working with engineers and contractor on County Road C project <br />o Started the 2019 valve exercising program <br />o Began the 2019 Lead / Copper sampling program <br />o Staff participated in OSHA Confined Space Training <br />o Completed the painting project inside City Hall <br />Attachments: <br />A: 2019 Project Map <br />B: 2019 PMP Status Map <br />C: City Hall Parking Lot Phase 1 Plan <br />D: July Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.