Upper Villa <br />o This project is essentially complete. All restoration will be finalized by the end of <br />July. <br />Ramsey County: <br />• County Road C Reconstruction: Hwy 88 to Long Lake Road <br />o The County will be reconstructing County Road C between Highway 88 in St. <br />Anthony and Long Lake Road in Roseville in 2019. <br />o Work is underway with traffic down to one lane in each direction. <br />• Traffic is anticipated to shift to the west bound lanes in late August. <br />• County Road C Concrete Rehabilitation: Cleveland Ave to Snelling Ave <br />o Work includes concrete maintenance on County C between Cleveland Avenue <br />and Snelling Avenue. Work includes ADA upgrades and concrete joint repairs. <br />o Work is currently ongoing with traffic down to one lane in each direction. Work <br />is scheduled to go through mid- August. <br />• Lexington Avenue Resurfacing, County Road C2 to County Road E <br />o The mill and overlay portion of the project will take place in August or <br />September. <br />Minnesota Department of Transportation updates: <br />• I -35W MnPASS project - hM://www.dot.state.mn.us/metro/proiects/i35wroseville/ <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing I -35W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave I -35W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area. <br />o Install noise walls on the east side of I -35W just north of the County Road C <br />ramps to County Road D. <br />o Contract was awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Major mad work is underway. <br />• The southbound TH 51 (Snelling Avenue) turn lane to southbound <br />Hamline will be closed for the remainder of the project. <br />• All traffic is shifted to the northbound lanes with two through lanes in <br />each direction. <br />• The Southbound I-35 ramps to County mad C will be closed through <br />November. <br />• Rosegate Avenue will be closed through November. <br />Miscellaneous Updates: <br />• Campus Solar <br />o The Maintenance Building Solar PV System has been installed and is operational. <br />This system is estimated to produce approximately 56% of the energy needed by <br />the Maintenance Building. <br />• Organics Drop off Site <br />o Work has begun on construction of the Organic Drop Off Site at the Leaf <br />Recycling Center off of Dale Street. <br />City Council Update: <br />• July <br />o Received the 2020-2039 Capital Improvement Plan. <br />o Approved the vacation of Albemarle Street right-of-way between Elmer Street <br />and Skillman Avenue. <br />