My WebLink
|
Help
|
About
|
Sign Out
Home
2019_08-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_08-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 11:12:45 AM
Creation date
8/23/2019 11:11:44 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/27/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: August 27, 2019 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 2 <br />Item No: 4 <br />o The contract for this project was awarded on July 23, 2018. <br />o Work will continue through September of 2019. <br />o Work includes: HVAC upgrades, electrical upgrades including creation of an <br />electrical room, security upgrades, replacement of two pumps and replacement of <br />some underground piping and valves. <br />o Work on this phase is approximately 90% completed. <br />• 2019 Sewer CIPP <br />o The 2019 project involved 4.8 miles of sanitary sewer pipe and one small segment <br />of storm sewer. All work on this project is completed. <br />• Fernwood Lift Station <br />The project includes the upgrade of the lift station. The project was awarded to <br />Minger Construction, Inc on July 8. Work on the lift station will likely begin mid <br />to late summer of 2019. <br />• 2019 Pavement Management Project <br />o This year's pavement management project consists of approximately 8.5 miles of <br />mill and overlay. Work is currently focused on two neighborhoods off of <br />Lexington Avenue north of County Road B2. <br />o The project is about 60% completed. See Attachment B for areas completed. <br />• City Hall Parking Lot <br />o The project consists of reconstructing the parking lot between City Hall and the <br />Maintenance Facility. Work involves the realignment of the access to Civic <br />Center Drive, related storm sewer work, achieving ADA compliance, and <br />replacement of water and sewer mains under the parking lot. <br />o The water and sanitary sewer have been replaced. The storm sewer work is <br />ongoing with curb work and grading following shortly thereafter. <br />o The project should be completed by October 4th. See attachment C for phasing <br />and parking during the construction. <br />• At least 20 parking spots, including handicapped parking, will be available <br />to visitors to City Hall. <br />Ramsey County Library Entrance Modification <br />o Bids were opened on August 20. The bids came in higher than anticipated but <br />Ramsey County, who is paying for the improvements, wants to proceed with the <br />project. The project is scheduled to be awarded at the August 26 Council meeting. <br />Work will be done this fall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.