My WebLink
|
Help
|
About
|
Sign Out
Home
2019_09-924_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_09-924_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2019 10:01:34 AM
Creation date
9/20/2019 10:00:51 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/24/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the PWET Commission select two or three members to interview candidates off line <br />and submit that recommendation to the full Commission in October. That <br />recommendation, if approved by the full Commission, will be forwarded to the City <br />Council for a formal appointment. <br />City Council Update: <br />• September <br />Major Maintenance Activities: <br />• Street and Storm <br />o Installed and removed about 450 signs for State Fair Parking <br />o Assisted with large watermain break on Cleveland Avenue. <br />o Completed crack sealing. <br />o Completed third sweep <br />o Ongoing Streetscape maintenance. . <br />o Started 5th mow. <br />o Re -painting of message pavement markings completed. <br />o Began crack sealing roads. <br />o Ongoing repair of failed catch basins. <br />o Ongoing mill and patching of delamination streets. <br />o Ongoing spray injection patching of delamination streets. <br />o Ongoing compost turning continuing Friday. <br />o Ongoing sign repair and installs. <br />o Some tree trimming. Minor wind related limbs down. <br />o Ongoing debris clearing of pond inlets and outlets related to continual rainfall. <br />0 682 tons of contractual 900 ton of salt delivered and stacked in salt bin. <br />o Street Maintenance completed catch basin tuck pointing/ profiling. Contractor <br />followed up with Flex seal skim coating product. <br />Water and Sanitary Sewer <br />o Repaired watermain break on Cleveland Avenue <br />o Continued collecting sanitary sewer flow data every other Friday <br />o Completed flushing and inspecting private hydrants <br />o Ongoing hydrant painting. <br />o Continued the 2019 Sanitary Sewer Cleaning program <br />o Collected water samples for bacteriological and disinfectant by-product testing <br />o Continued replacing meter heads and radios <br />o Continued working with engineers and contractors on the Booster Station Phase 2 <br />project <br />o Continued working with city engineers and consulting engineers on the Femwood <br />lift station project. <br />o Continued working with engineers and contractor on County Road C project <br />o Continued the 2019 valve exercising program <br />o Continued 2019 Lead / Copper sampling program <br />Attachments: <br />A: 2019 Project Map <br />B: 2019 PMP Status Map <br />C: City Hall Parking Lot Phase 1 Plan <br />D: September Development Activity Report <br />E: Youth Commission Member Recruitment Flyer <br />
The URL can be used to link to this page
Your browser does not support the video tag.