Laserfiche WebLink
the PWET Commission select two or three members to interview candidates off line <br />and submit that recommendation to the full Commission in October. That <br />recommendation, if approved by the full Commission, will be forwarded to the City <br />Council for a formal appointment. <br />City Council Update: <br />• September <br />Major Maintenance Activities: <br />• Street and Storm <br />o Installed and removed about 450 signs for State Fair Parking <br />o Assisted with large watermain break on Cleveland Avenue. <br />o Completed crack sealing. <br />o Completed third sweep <br />o Ongoing Streetscape maintenance. . <br />o Started 5th mow. <br />o Re -painting of message pavement markings completed. <br />o Began crack sealing roads. <br />o Ongoing repair of failed catch basins. <br />o Ongoing mill and patching of delamination streets. <br />o Ongoing spray injection patching of delamination streets. <br />o Ongoing compost turning continuing Friday. <br />o Ongoing sign repair and installs. <br />o Some tree trimming. Minor wind related limbs down. <br />o Ongoing debris clearing of pond inlets and outlets related to continual rainfall. <br />0 682 tons of contractual 900 ton of salt delivered and stacked in salt bin. <br />o Street Maintenance completed catch basin tuck pointing/ profiling. Contractor <br />followed up with Flex seal skim coating product. <br />Water and Sanitary Sewer <br />o Repaired watermain break on Cleveland Avenue <br />o Continued collecting sanitary sewer flow data every other Friday <br />o Completed flushing and inspecting private hydrants <br />o Ongoing hydrant painting. <br />o Continued the 2019 Sanitary Sewer Cleaning program <br />o Collected water samples for bacteriological and disinfectant by-product testing <br />o Continued replacing meter heads and radios <br />o Continued working with engineers and contractors on the Booster Station Phase 2 <br />project <br />o Continued working with city engineers and consulting engineers on the Femwood <br />lift station project. <br />o Continued working with engineers and contractor on County Road C project <br />o Continued the 2019 valve exercising program <br />o Continued 2019 Lead / Copper sampling program <br />Attachments: <br />A: 2019 Project Map <br />B: 2019 PMP Status Map <br />C: City Hall Parking Lot Phase 1 Plan <br />D: September Development Activity Report <br />E: Youth Commission Member Recruitment Flyer <br />