My WebLink
|
Help
|
About
|
Sign Out
Home
2019_10-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_10-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:20:00 PM
Creation date
10/18/2019 3:10:44 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/22/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: October 22, 2019 Item No: 4 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 2 <br />o The contract for this project was awarded on July 23, 2018. <br />o Work includes: HVAC upgrades, electrical upgrades including creation of an <br />electrical room, security upgrades, replacement of two pumps and replacement of <br />some underground piping and valves. <br />o All major work is completed other than some minor cleanup. <br />Fernwood Lift Station <br />o The project includes the upgrade of the lift station. The project was awarded to <br />Minger Construction, Inc on July 8. Work on the lift station will begin in Spring <br />of 2020 <br />2019 Pavement Management Project <br />o This year's pavement management project consists of approximately 8.5 miles of <br />mill and overlay. <br />o The only major work remaining is at Lincoln/County Road C2. This work is <br />scheduled to be completed by October 25. <br />o The project is about 95% completed. See Attachment B for areas completed. <br />• City Hall Parking Lot <br />o The project consists of reconstructing the parking lot between City Hall and the <br />Maintenance Facility. Work involves the realignment of the access to Civic <br />Center Drive, related storm sewer work, achieving ADA compliance, and <br />replacement of water and sewer mains under the parking lot. <br />o All utilities and concrete work are completed. <br />o Final paving is scheduled for Wednesday October 23. The full parking lot should <br />be able to be opened up be early the week of October 28. <br />Ramsey County Library Entrance Modification <br />o Work on the project began October 14. Work is scheduled to be completed <br />November 1. <br />Metropolitan Council Environmental Services updates: <br />• Upper Villa Area <br />o All work on the project is completed. <br />Ramsey County: <br />• County Road C Reconstruction: Hwy 88 to Long Lake Road <br />o The County will be reconstructing County Road C between Highway 88 in St. <br />Anthony and Long Lake Road in Roseville in 2019. <br />Work is underway with traffic down to one lane in each direction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.