My WebLink
|
Help
|
About
|
Sign Out
Home
2019_10-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_10-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:20:00 PM
Creation date
10/18/2019 3:10:44 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/22/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Ongoing inlet outlet clearing 5" in September. System is at full capacity. <br />o Ongoing Compost site maintenance. Open for fall leaves <br />• Water and Sanitary Sewer <br />o Continued collecting sanitary sewer flow data every other Friday <br />o Collected water samples for bacteriological and disinfectant by-product testing <br />o Continued replacing meter heads and radios <br />o Continued working with engineers and contractors on the Booster Station Phase 2 <br />proj ect <br />o Met with engineers to discuss Phase 3 of the Booster Station <br />o Continued working with city engineers and consulting engineers on the Fernwood <br />lift station project <br />o Continued the 2019 valve exercising program <br />o Continued working with engineering staff on the new asset maintenance software <br />o Began flushing dead end hydrants <br />o Painted all 19 overhead doors on the Maintenance Facility and Police department <br />buildings <br />o Replaced the SCADA radios in all lift stations and water tower <br />o Repaired the first broken water main of the season <br />o Met with Xcel Energy regarding Phase 2 Booster Improvement Energy Rebates. <br />Due to the improvements made to the Booster Station, the City will realize an <br />estimated annual cost savings of $47,935 and receive a rebate of $25,794! <br />Attachments: <br />A: 2019 Project Map <br />B: 2019 PMP Status Map <br />C: September Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.