My WebLink
|
Help
|
About
|
Sign Out
Home
2019-11-7_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2019
>
2019-11-7_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 1:47:04 PM
Creation date
11/1/2019 1:46:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Timeframe <br />It is expected that upon a contract award the Contractor will begin work immediately in a manner <br />that is consistent with the final work plan developed in cooperation with and approved by the City <br />of Roseville. The final work plan will include detailed methods and milestones, incorporate <br />expectations described in the RFP, potential risk mitigation methods, and the scope of work. All <br />work must be completed no later the ???? Schedule must be coordinated with attached schedule <br />of existing Parks and Recreation activities. <br /> <br />It is in the best interest of the City of Roseville to complete the work of this RFP in the most <br />expeditious manner possible that allows the improvements to be completed for the greatest <br />benefit to the Community <br /> <br />Page 5of 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.