My WebLink
|
Help
|
About
|
Sign Out
Home
2020_06-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_06-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 8:33:30 AM
Creation date
6/23/2020 8:30:55 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/23/2020
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: June 23, 2020 Item No: 6 <br />Item Description: Communication Items <br />Public Works Project updates: <br />• Water Booster Station Phase 2 <br />o All major work is completed. <br />o Staff is beginning the design phase for Phase 3 improvements which would <br />include some building improvements, site security and providing some additional <br />pipe redundancy. Construction for this phase will likely be a few years out. <br />• Fernwood Lift Station <br />o The project includes the upgrade of the sanitary sewer lift station on Fernwood <br />Street near Larpenteur Avenue. The project was awarded to Minger Construction, <br />Inc. on July 8. All major work in the lift station is completed. <br />• Galtier Lift Station <br />o The project includes the upgrade of the sanitary sewer lift station at Galtier Street <br />just south of South Owasso Drive. The project was awarded to Pember <br />Construction, Inc. on June 8. Work is expected to begin later this fall. <br />• 2020 Pavement Management Project <br />o The City awarded the project to Bituminous Roadways on February 24. Work has <br />been underway since May. The project is approximately 60% completed. Work <br />is expected to be completed by the end of July. <br />• City Hall Parking Lot <br />o All major work on the project is completed. <br />• Ramsey County Library Entrance Modification <br />o All major work on the project is completed. <br />• 2020 Sanitary Sewer Lining Project <br />o Visu- Sewer was awarded the contract in November. <br />o They have started pre -cleaning and televising pipes in Roseville. <br />o Work on the project is about 90% completed. Work will be ongoing through the <br />end of July. <br />• 2020 Pathway Improvements <br />o The City awarded the project to Bituminous Roadways. Work involves <br />construction of new pathways in Tamarack Park, Langton Lake Park, and on Dale <br />Street. Some pathways in Willow Park and Central Park will be resurfaced as <br />part of the project. The parking lot at Victoria Street on the east side of Bennett <br />Lake, the parking lot at Langton Lake ballfields and the two parking lots at Acorn <br />Park will be resurfaced as part of the project. Work is expected to begin in late <br />June and be completed by September. <br />
The URL can be used to link to this page
Your browser does not support the video tag.