My WebLink
|
Help
|
About
|
Sign Out
Home
2020_06-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_06-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 8:33:30 AM
Creation date
6/23/2020 8:30:55 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/23/2020
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water and Sanitary Sewer <br />o Attended a Disaster Management for Water and Wastewater Utilities Training. <br />o Collected water samples for bacteriological and disinfectant by-product testing. <br />o Due to COVID 19, staff has stopped entering houses for such things as meter and <br />radio replacements, high utility bill discussions, low water pressure testing. <br />o Continued working with engineers and contractors to final out the Booster Station <br />Phase 2 project. <br />o Worked with engineers, consultants and contractors on starting and finishing the <br />Fernwood lift station project. <br />o Continued working with city engineers and consulting engineers and contractors <br />on the Galtier lift station, the Booster Phase 3 and the 2020 PMP projects. <br />o Replaced the 30" butterfly valve inside the Booster Station. <br />o Repaired 14 broken water mains and one leaking gate valve. <br />o Restored damaged boulevards from this past winter's broken water main repairs. <br />o Worked with contractor and consulting engineers on Verizon's 5G upgrade on the <br />water tower. <br />o Assisted streets with snow removal. <br />o Rented a pump twice to maintain the level in the Owasso Pond. New pumps have <br />been ordered. <br />o Rented a pump for the Arona pond. New pumps have been ordered. <br />o Repaired the motor and pump 1 for St. Croix storm water pond lift station. <br />o Repaired a manhole at County Road B & Dale Street. <br />o Created the 2019 Water Quality Report and posted to the City's web site. <br />o Began the 2020 hydrant flushing and sewer cleaning programs. <br />o Attended OSHA and asset software training. <br />o Replaced the fire alarm panel in City Hall. <br />o Serviced the stand-by generators at City Hall and the Maintenance Facility. <br />o Worked with contractor to wash windows in City Hall, the Police department, <br />Maintenance Facility and the License Center. <br />Attachments: <br />A: 2020 Roseville Project Map <br />B: 2020 PMP Project Map <br />C: 2020 Pathway Project Map <br />D: May Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.