Laserfiche WebLink
• 4/13/20 - Snow season ended with 7" on tables and benches. Minor road <br />slush minimal refreeze. Total measurement Roseville PW measurements: <br />• 44.80" 532 ton of salt used. <br />• 25,457 gallons of salt brine used. <br />• 7,124 gallons of beet juice additive. <br />• 4/15/20-5/21/20 Street Sweeping resumed, reswept all roads. <br />• All staff use separate vehicles and social distancing practiced. <br />• Asphalt plants opened. Throw and go patching started. <br />• Settled winter water break patches removed and permanent patching <br />started. <br />• Plow damage turf repair started. <br />• Mailbox repairs started. <br />• All winter brine systems cleaned, plow truck wings removed. <br />• Streetscape areas cleaned. <br />• Some weeding started. <br />• Trash pickup started. <br />• Some irrigation repairs started. <br />• Catch basin repairs started. <br />o May <br />• 5/1/20 Compost and wood chip deliveries started. <br />• 5/18/20 - 5 seasonal employees started. All using separate vehicles and <br />following Roseville's COVID-19 policy. <br />• First Citywide mowing completed. <br />• Ongoing 4 person street sweeping operation. <br />• Ongoing 4 person asphalt crew operation. <br />• Ongoing Compost site maintenance and deliveries. <br />• Fence, Mailbox and turf repairs completed. <br />• Repaired Street name signs. <br />• Contractual Street Centerline painting completed. <br />• Completed Streetscape irrigation repairs. <br />• Trees and planting areas weeded and chips installed. <br />o June <br />• All Street messages painted. <br />• Ongoing street milling and patching. <br />• Contractual concrete repairs completed and City crew asphalt patching <br />and seeding completed after them. <br />• Daily one-man spray patching with truck mounted rental unit. <br />• Ongoing picking up of FAB tree branches that fall or are hung up. <br />• Completed second city-wide mowing. <br />• Finishing up mulching of all streetscape areas. <br />• Ongoing compost site turning and maintenance. <br />• Ongoing catch basin repairs and patching. <br />• The 2 Central Garage mechanics again did an exceptional job in keeping <br />the City Fleet operational and working with the new implemented safety <br />standards set with Covid 19. <br />• Plow fleet was gone through before we put it to rest till October (4 months <br />away). <br />• Compost turner was in for annual repairs. <br />• City broom issues were resolved with the longer spring sweeping. <br />• Ongoing Public Safety Fleet issues have been resolved. <br />