Laserfiche WebLink
Kimley>))Horn <br />Fairview Avenue & County Road 132 — During the Saturday peak hour, the eastbound right -turn <br />movement is anticipated to operate at LOS F. <br />Vehicle Queue Deficiencies <br />Vehicle queues were summarized based on the Synch ro/S i mTraff ic analysis, and are provided in the <br />summary table in Appendix D. The analysis compared the anticipated 951h percentile queue to the existing <br />storage provided at the turn lanes. Following provides a list of turn lane deficiencies, where the 95th <br />percentile queue exceeded the provided storage by at least 25 feet (one vehicle length): <br />Fairview Avenue & TH 36 (WB) —The northbound left -turn and right -turn lanes exceed the provided <br />storage, due to the through lanes spilling back beyond entry into the turn lanes. <br />Fairview Avenue & Mall Entrance #1 — The southbound left -turn lane is anticipated to exceed the <br />provided to storage: however, extending the turn lane is limited by the northbound left -turn lane at the <br />intersection of Fairview Avenue & County Road 32. <br />Fairview Avenue & County Road 132 — The westbound left -turn lane is anticipated to exceed the <br />provided storage: however, the extending the left -turn lane is limited by the eastbound left -turn lane at <br />the intersection of County Road 32 & Mall Entrance #2. <br />County Road 132 & Mall Entrance #2 — The eastbound left -turn and right -turn lanes are anticipated to <br />exceed the provided queue, however, there is no opportunity to provide more storage due to its <br />proximity to Fairview Avenue. The westbound left -turn lane is anticipated to exceed the provided <br />storage by 30 feet, however, there is no opportunity to provide more storage due to the proximity of the <br />signalized intersection to the east. <br />County Road 132 & Mall Entrance #3 —The westbound right -turn lane is anticipated to exceed the <br />provided queue, this is due to the westbound through queue spill back beyond the entry into the right - <br />turn lane. <br />County Road 132 & Snelling Avenue NB — The southbound queues are anticipated to spill back to <br />where the left and right turn lanes start, however, it is not anticipated to spill back into the Snelling <br />Avenue travel lanes. <br />SHORT-TERM BUILD (2024) (W/IMPROVEMENTS) OPERATIONS SUMMARY <br />Due to the failing traffic operations in the 2019 and 2024 conditions, improvements to the traffic network in <br />the study area will be required to help mitigate excessive queuing and delays. Only those improvements <br />that could be implemented without major reconstruction of the roadway and surrounding area were <br />considered as mitigation. The following improvements were assumed for the 2024 build -out year and will <br />need to be explored further with the City of Roseville, Ramsey County, and MnDOT: <br />Fairview Avenue at TH 36 (EB) <br />• Convert the WB right -turn from yield control to a free movement. <br />• Optimize splits and offset for the traffic signal. <br />Fairview Avenue at TH 36 (WB) <br />• Convert the northbound right -turn lane into a third NB through lane. This will require modifying the <br />existing channelized islands on the east side of Fairview Avenue, in addition to the relocation or <br />replacement of the northbound and eastbound approach signal poles and mast arms. <br />• Construct new northbound right -turn lane that serves the on -ramp to TH 36 (WB). <br />• Traffic signal modification. Optimize splits and offset for the traffic signal. <br />Rosedale Center I Traffic Impact Analysis <br />January 2020 Update <br />