My WebLink
|
Help
|
About
|
Sign Out
Home
2020_07-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_07-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 3:46:57 PM
Creation date
7/24/2020 3:36:32 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/28/2020
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley>Morn <br />Fairview Avenue at County Road 132 W <br />• Construct an eastbound right -turn lane (if ROW is available). <br />• Optimize splits and offset for the traffic signal. <br />Table 5 provides the results of the Short -Term Build (2024) (With Improvements) delay and LOS for both <br />the weekday PM and Saturday peak hours. The analysis represents the Short -Term Build (2024) scenario <br />with the addition of the recommended improvements listed above. With the recommended improvements, <br />all intersections are anticipated to operate at an acceptable level of service for Short -Term Build (2024) <br />conditions during the weekday PM and Saturday peak hours. Table G and Table H (included in Appendix <br />C) provides the delay and LOS for each individual movement for the weekday PM and Saturday peak hours. <br />TABLE 5: SHORT-TERM BUILD WITH IMPROVEMENTS (2024) LEVEL OF SERVICE SUMMARY <br />It is suggested that the City of Roseville, Ramsey County, and MnDOT, in addition to representatives from <br />Rosedale Center, meet to discuss the mitigation measures listed above and any other potential alternative <br />improvements along Fairview Avenue. A second mitigation option was considering and analyzed, which <br />included adding dual westbound right -turn lanes at the intersection of Fairview Avenue & TH 36 EB. Based <br />on the Synchro/SimTraffic analysis, the westbound right -turn movement is anticipated to operate at LOS E <br />during the Saturday peak hour. Furthermore, the northbound through movement at Fairview Avenue & TH <br />36 WB is still anticipated to operate at LOS F with delay over 100 seconds with this improvement. <br />LONG-TERM BACKGROUND (2040) OPERATIONS SUMMARY <br />Table 6 provides Long -Term Background (2040) delay and LOS for both the weekday PM and Saturday <br />peak hours. The analysis represents 20-year growth in the background volumes to 2040 and includes the <br />recommended improvements from the Short -Term (2024) analysis. Table I and Table J (included in <br />Appendix C) provides the delay and LOS for each individual movement for the weekday PM and Saturday <br />peak hours. All intersections are anticipated to operate at LOS D or better during the weekday PM peak <br />hour and Saturday peak hour. <br />Rosedale Center I Traffic Impact Analysis <br />January 2020 Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.