Laserfiche WebLink
collection hours from the Recycling Coordinator or <br />designated alternate. <br />h) Failure to Complete a Majority (50%) of the Collection <br />District: $2,500 for each incident. <br />i) Failure of the Conctractor to immediately, or within 6 <br />hours maximum, clean up a spill or material spilled by <br />Contractor within six (6) hours of an incident: $250 each <br />incident PLUS any additional costs accrued by the City to <br />ensure proper MS4 compliance. <br />j) Failure to leave an education tag when non -recyclable <br />material or material that is inappropriately prepared <br />according to specifications in Item 5.08 is not collected: <br />$100 each incident <br />k) Failure or neglect to collect recycling from a missed <br />pickup location according to specifications in 5.11: $250 <br />each incident <br />1) Distributing recycling carts without recycling symbols or <br />labels that include text and graphics depicting what <br />materials may be placed in the carts, and not replacing <br />torn, dirty, unreadable labels: $100 each incident <br />m) Failure to maintain recycling carts in proper working <br />order as specified in 5.05: $100 each incident <br />n) Failure to provide a complete monthly report as specified <br />in 6.01 and 6.02.: $250 each incident <br />o) Failure to return cart to curbside location: $100 each <br />incident <br />p) Employees smoking in enclosed structures while <br />performing duties, extinguishing smoking material <br />anywhere other than in container as specified in 5.02, or <br />not following general no smoking rules: $50 each incident <br />q) Failure to collect recyclables according to specifications in <br />5.05 and 5.08: $250 for each incident. <br />The Contractor shall be liable for performance penalties in the <br />amount(s) upon determination of the City of Roseville that <br />performance has not occurred consistent with the provisions of the <br />36 <br />