My WebLink
|
Help
|
About
|
Sign Out
Home
2020_09-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_09-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 11:24:01 AM
Creation date
9/18/2020 11:20:05 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/22/2020
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 22, 2020 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2020 Pavement Management Project <br />o The City awarded the project to Bituminous Roadways on February 24. Work has <br />been underway since May. All work on the project is completed. <br />• Galtier Lift Station <br />o The project includes the upgrade of the sanitary sewer lift station at Galtier Street <br />just south of South Owasso Drive. The project was awarded to Pember <br />Construction, Inc. on June 8. Work is expected to begin in the spring of 2021. <br />Ramsey County: <br />• Larpenteur Avenue — 4:3 Lane Conversion Project <br />o Ramsey County will complete permanent improvements to finalize the four to <br />three lane conversion that was started last fall. The project limits are Dale Street <br />to I-35E. Work involves micro -surfacing and installing concrete medians, striping <br />and signage. The road will be open during the work. Work is under construction <br />and is expected to be completed by the end of September. <br />Minnesota Department of Transportation updates: <br />• I-35W MnPASS project- <br />httD://www.dot.state.mn.us/metro/broiects/35wnorthmnDass/index.html <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of <br />existing I-35 W between County Road C in Roseville and Lexington Avenue <br />(County Rd 17) in Blaine. <br />o Repave I-35W and ramps between County Road C in Roseville to just north of <br />Sunset Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I-35W just north of the County Road C <br />ramps to County Road D. <br />o Rosegate west of Cleveland Avenue will be closed through November to <br />accommodate bridge reconstruction. <br />o Contract was awarded in October 2018 to Ames Construction which had the <br />winning Design/Build Proposal. Total cost is $208 million. <br />o Work is ongoing and will continue through 2021. <br />Miscellaneous: <br />0 Rosedale has begun converting the ring road to a two way ring road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.