Laserfiche WebLink
Attachment C <br />Project Capability Plan <br />This template must be used. The Project Capability Plan should identify the Contractor's capability to meet the <br />requirements for recycling service. The capability claims should be prioritized (list the most important claims first). The <br />Contractor may add or delete Project Capability Claim table templates, but do not exceed the two -page limit. Do NOT <br />include any identifying information in your Plan. Information listed under the "Documented Performance" line may <br />describe where the Contractor has used the approach or solution previously, and what the results were in terms of <br />verifiable metrics. <br />Project Capability 1 Claim: <br />Documented Performance: <br />Project Capability 2 Claim: <br />Documented Performance: <br />Project Capability 3 Claim: <br />Documented Performance: <br />Project Capability 4 Claim: <br />Documented Performance: <br />Project Capability 5 Claim: <br />Documented Performance: <br />Project Capability 6 Claim: <br />Documented Performance: <br />62 <br />