My WebLink
|
Help
|
About
|
Sign Out
Home
2020_09-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_09-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 11:24:01 AM
Creation date
9/18/2020 11:20:05 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/22/2020
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment D <br />Project Community Values Capability <br />This template must be used. The Contractor must identify its capability to meet the Community Values: <br />• Collection Operations —which includes Clean and quiet; Impact on street (size and weight of trucks), Easy to <br />participate, Flexibility to Comingle, More materials picked up — particularly plastics, Materials are efficiently recycled <br />(local markets, highest and best use for material), Rewards for adding value, Multi -family dwelling recycling <br />• Resident and Community Engagement Efforts — which includes Voluntary expansion to businesses, Effective frequent <br />education of residents —with measurement, Community involvement, Annual report that includes information on what <br />happens to material, Outreach to low participating communities, Outreach using electronic communications <br />• Environmental —which includes Experience with Zero Waste events, Reduced carbon footprint, Education and <br />Leadership on Environmentally Preferred Purchasing (EPP), Local vendor -terminal and MRF locations <br />The capability claims should be prioritized (list the most important claims first). The Contractor may add or delete <br />Project Capability Claim table templates, but do not exceed the two -page limit. Do NOT include any identifying <br />information in your Plan. Information listed under the "Documented Performance' line may describe where the <br />Contractor has used the approach or solution previously, and what the results were in terms of verifiable metrics. <br />Community Values Capability 1 Claim: <br />Documented Performance: <br />Community Values Capability 2 Claim: <br />Documented Performance: <br />Community Values Capability 3 Claim: <br />Documented Performance: <br />Community Values Capability 4 Claim: <br />Documented Performance: <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.