Laserfiche WebLink
G. Water Billings: Water billings shall start at the time of installation of the water meter or, in <br />the event the meter is not installed, seven days after completion of outside piping, and shall <br />be calculated upon the minimum quarterly rate prorated on a monthly basis. (Ord. 455, 2-8- <br />65; Md. 1990 Code) <br />Before any grading or excavation is started, the water shutoff box shall be located and checkeeT <br />for damage by the contractor. Location ties will be famished by the Chief Code Enforcement <br />Officer at the time connection permit is issued. If the shutoff box cannot be located or is found <br />bent or in a damaged condition, the Public Works Director is to be called at once. The contractor <br />assumes all responsibility for damage to shutoff box unless the Public Works Director certifies <br />that damage existed before excavation or grading started. (1990 Code; Md. 1995 Code) <br />801.08: EXCAVATION AND CONSTRUCTION REQUIREMENTS: <br />A. Permit Required: No excavation shall be made until a permit for the connection has been <br />issued. <br />B. Separate Trenches; Exception: No water service pipe or water connection shall be installed <br />in the same trench or closer than ten feet horizontally to a sewer trench or drain laid, or to be <br />laid, either in the street or in private property, except that the water pipe on private property <br />may be in a common trench with a sewer drain approved by the Public Works Director. The <br />horizontal distances between the sewer pipe and the water service is at least ten feet at the <br />property line and that the water service pipe approaches the sewer trench at an angle with <br />the property line of not less than 45 degrees and having bends with not less than three foot <br />radius. <br />C. Conditions for Single Trench: Where it is desired to lay the water service pipe and the <br />building drain or building sewer pipe less than ten feet apart, the water service pipe shall be <br />above the sewer pipe and, unless impractical, it shall be placed at least two feet above the <br />sewer and on a solid shelf excavated at one side of the trench. <br />D. Sewer Pipe: The sewer pipe shall be constructed of substantial material which is corrosion - <br />resistant and installed so as to remain watertight as approved by the Public Works Director. <br />E. Water Service Pipe: The water service pipe shall be watertight and corrosion resistant of a <br />material approved by the Public Works Director. <br />F. Foundation and Backfill: In all cases precautions shall betaken to assure a firm foundation <br />for the pipes. The intervening space between the pipes shall be backfilled with compact <br />earth. (Ord. 530, 3-20-67). <br />801.09: SUPERVISION BY PLUMBER: <br />All piping connections from curb box to house supply piping shall be made under the <br />supervision of a plumber licensed by the City. (Ord. 399, 8-12-63; amd. 1995 Code) <br />801.10: LOCATION OF CURB STOP BOXES: <br />Curb stop boxes will be installed at a point on the property line most suitable to the property and <br />shall be left in an accurate vertical position when backfilling is completed. Curb stop boxes will <br />