Laserfiche WebLink
diverse plan as possible. Currently there are 12 members on the team, and <br />staff are looking to add two more in the very near future. <br />The first Energy Action Team meeting is scheduled for Thursday, December <br />3, 2020, from 6:OOpm — 8:30pm. The Center for Energy and Environment <br />(CEE) will facilitate the meeting, and compile the information from the <br />meeting for the group. There will be roughly 6 weeks between the first <br />meeting and the second. <br />o The city's Partner in Energy webpage will be updated as new information <br />becomes available: www.cityofroseville.com/Partners-in-Energy. <br />City Council Update: <br />• Approved professional service contract for Engineering Services for Rehabilitation of <br />Long Lake Lift Station. <br />• Approved Cooperative Agreement with Ramsey County for Right of Way <br />Acquisition for County Road B2 between Fairview Avenue and Hamline Avenue. <br />• Approved St Rose of Lima Drainage Improvement Cooperative Agreement. <br />• Approved a resolution setting the date of sale for the issuance of the City's 2020 <br />General Obligation Bonds for December 7, 2020. These bonds will refinance <br />previously issued bonds from 2011 at a better interest rate as well as new bonds to <br />provide capital funding for the water utility. <br />Major Maintenance Activities: <br />• Street and Storm <br />0 10/20/20 7" snow, full plow. <br />0 1 l/11/20 5" snow, full plow. <br />o Central Garage repairs and bugs worked out of all plow equipment. <br />o Ongoing winter tree trimming of City boulevard trees. <br />o Asphalt patches on 4 water breaks and 1 sanitary sewer repair. <br />o Asphalt pavement repairs on hazard manholes we found when plowing. <br />o Concrete sidewalk panels pulled and poured at Centre Pointe Dr. and Owasso <br />Hills Drive. <br />o Ongoing final sump cleaning before freeze up. <br />o Ongoing Compost site maintenance. Site is approx. 60% full. <br />o Finished 2021 PMP Storm Sewer and Sanitary Sewer inspections. <br />Water and Sanitary Sewer <br />o Continued repairing water meters and MIUs. <br />o Collected water samples for bacteriological testing <br />o Continued working with city engineers and consulting engineers and <br />contractors on the Galtier and Long Lake lift stations and the Booster Phase 3 <br />Proj ect. <br />o Continued the 2020 sewer inspection / cleaning programs. <br />o Continued working with our SCADA integrator (AE2S) on SCADA upgrades <br />for 2020. <br />o Repaired 4 broken water mains. <br />o Laundered towels weekly used by office personnel for cleaning work areas <br />o Replaced the pumps at Arona Storm Water Lift Station. <br />o Worked with the property owner of Rosedale Market Place properties and a <br />contractor to replace the service valve to Chili's Restaurant. <br />o Worked with the contractor on the S. Owasso / Rice St. water main <br />connection. <br />