communication and security system enhancements, perimeter security fencing <br />and installation of additional water supply main to booster station and <br />pressure relief vault. <br />Lift Stations: The Gaultier Street Lift Station, located near Gaultier St and South Owasso <br />Boulevard, will be rehabbed in 2021. The project will also include replacement of pumps, <br />valves, electrical equipment, addition of a backup generator and addition of a new protective <br />coating to the wet well. <br />The Long Lake Lift Station, located on Long Lake Road south of County Road D will be <br />replaced in 2021 with a grinder pump lift station. The new lift station will be relocated <br />further from the road to protect the lift station and to make it safer to maintain and on higher <br />ground as it is currently subject to street flooding. <br />Storm sewer system improvements: Staff continues to analyze the existing drainage <br />systems and localized flooding issues and is identifying mitigation projects. Staff is now <br />working on developing a 2021 drainage improvement project to alleviate some of these <br />flooding concerns. Staff has already identified several projects for 2021. Some ofthe <br />projects include: <br />Pavement Management Storm Water Upgrades: Miscellaneous storm sewer <br />upgrades. <br />Ramsey County Ditch 4 Replacement (RCD 4) <br />o The existing ditch will be replaced with an 84" pipe. The replacement of the <br />ditch will provide better stormwater hydraulics and minimize maintenance <br />issues with the ditch. The installation of a pipe also allows a new pathway to <br />be constructed over the pipe. <br />In conjunction with Ramsey Washington Metro Watershed District, storm sewer <br />improvements at St Rose of Lima will be done. The parking lot will be reconfigured <br />to reduce impervious surface and an underground storm sewer system will be <br />installed. These improvements will reduce flooding in the neighborhood. <br />4. Other Improvements: <br />35W MnPASS Project (MNDOT): Construct MnPASS Express Lanes (one lane in each <br />direction) in the middle of existing I-35W between County Road C in Roseville and <br />Lexington Avenue (County Rd 17) in Blaine. Repave I-35W and ramps between County <br />Road C in Roseville to just north of Sunset Ave (County Road 53) in Lino Lakes. Replace <br />and repair bridges along the project area. Install noise walls on the east side of I-35W just <br />north of the County Road C ramps to County Road D. Road shoulder preparation (fall <br />2018): Repairing road shoulders and constructing crossovers on I-35W north of County Road <br />C. Contract will be awarded in October to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. Major road work should be completed by <br />the end of 2021. <br />Snelling Signal Replacements (MNDOT): MnDOT will replace the signal systems at <br />County Road C2 & Snelling and Roselawn and Snelling. ADA sidewalk improvements will <br />be included at this intersection. <br />