Laserfiche WebLink
2.5.7 Opt -in Program <br />The City allows small businesses and faith organizations to opt in to the City's recycling <br />program through an application process. To opt in, organizations and businesses need to send in <br />an application to the City, have a similar composition to a SUD, and be able to recycle materials <br />in a 96-gallon recycling cart. If these requirements are met, the City will approve the opt -in <br />application and provide the information to Contractor. The Contractor is t n responsible to drop <br />off the cart(s) and start collection on the next scheduled service date. <br />2.5.8 Procedure for Non -Targeted Materials <br />If the Contractor determines that a resident has set out noticeable and significant Non -Targeted <br />Materials, the driver shall use the following procedures: 1s11F%k <br />2.5.8.1 Curbside 'j^'% <br />Contractor shall leave the Non -Targeted Materials and leave an "education tag" indicating <br />acceptable materials and the proper method of preparation. <br />If the Non -Targeted Recyclables have been tipped into the ion truck the driver shall <br />record the address of the stop. The Contractor shall send a Lett e resident noting the Non - <br />Targeted Recyclables and providing information on what are acc ecyclables. The address <br />shall be recorded on a form acceptable to the City. Contractor shall the addresses to the <br />City Recycling Coordinator at the end of each month. <br />Upon request of the City, the Contractor will undertake additiona efforts to educate the resident <br />or owner regarding proper materials preparation. These additional education efforts shall be <br />conducted at no additional cost to the City. <br />4 <br />2.5.8.2 Multi -Unit Dwellings <br />Contaminated carts or dumpsters of material will not be collected, and a tag will be left <br />indicating the reason the material is unacceptable. The Contractor shall also notify the City <br />Recycling Coordinator within one business day by phone that the material was left and the <br />reason that the material was unacceptable. It will be the responsibility of the Contractor to obtain <br />cooperation from the building owner/manager in removal of trash and separation of acceptable <br />materials so that the carts can be serviced. The Contractor shall provide the City with a minimum <br />of one month's notice of any multi -unit education campaign plans. <br />2.6 City's An al Recycling Public Education Flyer <br />The Contractor will be responsible for publishing and dispersing an annual public education flyer <br />to be sent to all residents that contains the following recycling information: <br />List of materials to be included for recycling. <br />List of materials excluded that cannot be recycled in the City's program. <br />How to prepare materials. <br />RFP for City of Roseville Recycling Services • A-11 <br />