My WebLink
|
Help
|
About
|
Sign Out
Home
2021_05-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_05-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 10:05:15 AM
Creation date
5/28/2021 10:01:19 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/25/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: May 25, 2021 <br />Item Description: Communication Items <br />Item No: 5 <br />Public Works Project updates: <br />• 2021 Pavement Management Project <br />o The contract was awarded to Bituminous Roadways, Inc. on April 12. Work consists of <br />8.7 miles of road resurfacing. Additionally, signal modifications to Snelling and Lydia <br />are included. A new pathway will also be installed on Rice Street between County <br />Road C2 and Woodlyn Avenue. Work is expected to begin on June 1 and be completed <br />by October. <br />• County Road B Sewer Improvements <br />o Bids were opened on February 4 and the contract was awarded to SGP Contracting, Inc. <br />on February 22. Work involves repairing and upgrading the sanitary sewer system in <br />three locations on County Road B between Dale Street and Cohansey Street. The <br />project will be coordinated with Neel Energy's gas replacement project on County <br />Road B. Road closures and detours will be needed for the work and will be <br />communicated to residents and businesses when final dates are known. The estimated <br />start date is in mid -July and should be completed in 3-4 weeks. <br />• Ramsey County Ditch 4 Storm Sewer & Twin Lakes Trail Improvements <br />o Bids were opened on March 15 and the contract was awarded to Meyer Contracting on <br />March 22. Work involves replacing the existing ditch with an 84" pipe, grading and <br />installing a 10 foot wide bituminous trail over the pipe, lighting, landscaping and tree <br />installation. Major pipe work began May 17 and is expected to take another 6 weeks. <br />All pipe and trail work is scheduled to be completed by the end of September. <br />• 2021 Sewer Lining <br />o The contract was awarded to Visu-Sewer on November 30, 2020. The project consists <br />of lining 7.12 miles of pipe within the city. Work has been ongoing since December <br />and is 80 percent complete. All work is expected to be completed on the project by the <br />end of July. <br />• Galtier Lift Station <br />The project includes the upgrade of the sanitary sewer lift station at Galtier Street just <br />south of South Owasso Drive. The project was awarded to Pember Construction, Inc. <br />on June 8, 2020. Startup and testing of the lift station is expected to take place on May <br />24. <br />Cleveland Watermain Project <br />o The contract for this project was awarded on February 22 to SGP Contracting, Inc. <br />Work involves the replacement of the watermain between County Road C2 and County <br />
The URL can be used to link to this page
Your browser does not support the video tag.