My WebLink
|
Help
|
About
|
Sign Out
Home
2021_05-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_05-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 10:05:15 AM
Creation date
5/28/2021 10:01:19 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/25/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Road D. No road closures are anticipated but traffic on Cleveland Avenue will be <br />reduced to one lane in each direction. Work began May 17"'. Completion of the project <br />is expected by mid -August. <br />• St Rose of Lima Drainage Improvements <br />Bids were opened on February 3 and was awarded to OMG Midwest on February 22. <br />The project is a joint project with Ramsey Washington Metro Watershed District. Work <br />involves reducing the impervious amount of the parking lot, installation of rain gardens <br />and installation of an underground storage system. The improvements will reduce <br />runoff and provide treatment which should help reduce flooding in the neighborhood. <br />The project is anticipated to begin in early June and be completed by mid -August. <br />Ramsey County Updates <br />• County Road B2 Resurfacing and Signal Improvements <br />o This summer the County plans to resurface County Road B2 between Fairview Avenue <br />and Hamline Avenue. As part of the project they will be replacing three signal lights in <br />the corridor and upgrading curb ramps to meet ADA compliance. Additionally, a new <br />pathway will be installed on the north side of County Road B2, under the Snelling <br />Avenue bridge between the ramps. Work is expected to begin in late July. <br />Minnesota Department of Transportation updates: <br />• I-35W MnPASS project- <br />httn://www.dot.state.mn.us/metro/vroiects/35wnorthmnnass/index.html <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing <br />I-35W between County Road C in Roseville and Lexington Avenue (County Rd 17) in <br />Blaine. <br />o Repave I-35W and ramps between County Road C in Roseville to just north of Sunset <br />Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I-35W just north of the County Road C ramps to <br />County Road D. <br />o Rosegate west of Cleveland Avenue will be closed through November to accommodate <br />bridge reconstruction. <br />o Contract was awarded in October 2018 to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Work in this last year of the project will likely begin in April and will continue through <br />the end of 2021. <br />o The northbound 35W exit ramps to County Road C/Cleveland Avenue are closed and <br />will be closed through the summer until the ramp is rebuilt. The detour is posted to exit <br />onto County Road D. <br />o The northbound 35W on ramp from County Road C/Cleveland Avenue are closed and <br />will be closed through June 1. The detour is posted to the onramp at County Road D. <br />Snelling & Glenhill Improvements <br />o MnDOT plans to make permanent improvements to the Glenhill Road and Snelling <br />Avenue intersection starting May 10. Work is anticipated to take 3-5 weeks. During <br />this time, access to the neighborhood will only be available at Asbury Street as Glenhill <br />will be closed during construction. The improvements will make the current access <br />restrictions permanent, which provides only a northbound left in and a southbound <br />right-in/right-out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.