My WebLink
|
Help
|
About
|
Sign Out
Home
2021_06-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_06-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 4:33:18 PM
Creation date
6/18/2021 4:31:10 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning Code Update <br />o The Community Development Department is leading an effort to update the City's <br />Zoning Code, the set of rules that identifies how individual properties within the City <br />can be used. It also sets standards for how buildings may be developed or changed. A <br />key component of this update process is outreach and engagement. Towards that end, a <br />series of meetings will be hosted on a variety of topics related to the Zoning Code. The <br />first of those meetings was held on Thursday, March 25, and focused on Equity and <br />Inclusion/Sustainability and Resilience. More information about these specific <br />meetings, how to register and about the overall Zoning Code Update project can be <br />found at the following webpage http://citvofroseville.com/zoningupdate. <br />Major Maintenance Activities: <br />• Street and Storm <br />o Ongoing asphalt patching. <br />o Ongoing sign work. <br />o Ongoing message painting. <br />o Monthly compost turning. <br />o Compost deliveries <br />o Mulched landscaped areas. <br />o Ongoing weeding of streetscape areas. <br />o Completed third mowing. <br />o Working on pathway at Centre Pointe Drive. <br />o Repairing catch basins. <br />Water and Sanitary Sewer <br />o Continued flushing and inspecting fire hydrants. <br />o Continued repairing water meters and MIUs. <br />o Continuing the process of collecting water service data and upgrading water meters and <br />MIUs in park buildings. <br />o Collected water samples for bacteriological testing. <br />o Continued with our annual valve exercising program (12" and larger). <br />o Continued the Sanitary Sewer Cleaning Program for 2021. <br />o Completed the Galtier sanitary sewer lift station project. <br />o Continued working with engineering staff and the contractor on the Cleveland Avenue <br />Water Main Project, The Enclave at McCarron's Lake and the 2021 PMP. Staff has <br />also worked with MnDOT and their contractor on the 16" water main replacement <br />under the 35W Bridge over County Road C. <br />o Continued working with AE2S on the 2021 SCADA System Upgrades. <br />o The City Hall painting project has started in the Engineering department and will wrap <br />up this week The painters will then work on the Police department. Maintenance staff <br />have been helping with removing office cabinets for the painters and putting them back <br />up. <br />o Continued laundering towels weekly used by office personnel for cleaning work areas.. <br />o Replaced the garage floor drains for garages 3 & 4 at the Police department. <br />Attachments: <br />A: 2021 Roseville Project Map <br />B: 2021 PMP Phasing Map <br />C: May Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.