• St Rose of Lima Drainage Improvements <br />o Bids were opened on February 3 and was awarded to OMG Midwest on February 22. <br />The project is a joint project with Ramsey Washington Metro Watershed District. Work <br />involves reducing the impervious amount of the parking lot, installation of rain gardens <br />and installation of an underground storage system. The improvements will reduce <br />runoff and provide treatment which should help reduce flooding in the neighborhood. <br />The project is anticipated to begin in late June and be completed by mid -August. <br />Ramsey County Updates <br />• County Road B2 Resurfacing and Signal Improvements <br />o This summer the County plans to resurface County Road B2 between Fairview Avenue <br />and Hamline Avenue. As part of the project they will be replacing three signal lights in <br />the corridor and upgrading curb ramps to meet ADA compliance. Additionally, a new <br />pathway will be installed on the north side of County Road B2, under the Snelling <br />Avenue bridge between the ramps. Work is expected to begin in late July. <br />Minnesota Department of Transportation updates: <br />• I-35W MnPASS project- <br />httn://www.dot.state.mn.us/metro/vroiects/35wnorthmnnass/index.html <br />o Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing <br />I-35W between County Road C in Roseville and Lexington Avenue (County Rd 17) in <br />Blaine. <br />o Repave I-35W and ramps between County Road C in Roseville to just north of Sunset <br />Ave (County Road 53) in Lino Lakes. <br />o Replace and repair bridges along the project area <br />o Install noise walls on the east side of I-35W just north of the County Road C ramps to <br />County Road D. <br />o Rosegate west of Cleveland Avenue will be closed through November to accommodate <br />bridge reconstruction. <br />o Contract was awarded in October 2018 to Ames Construction which had the winning <br />Design/Build Proposal. Total cost is $208 million. <br />o Work in this last year of the project will likely begin in April and will continue through <br />the end of 2021. <br />o The northbound 35W exit ramps to County Road C/Cleveland Avenue are closed and <br />will be closed through the summer until the ramp is rebuilt. The detour is posted to exit <br />onto County Road D. <br />Snelling Signal Upgrades <br />o MnDOT will be replacing the signals at Snelling and County Road C2 and Snelling and <br />Roselawn this summer. Included with the project are upgrades to ADA ped ramps. <br />Traffic will be maintained at all times on Snelling. Work began on April 21. Work on <br />both signals is currently underway. Work should be completed by the end of June. <br />During this time, traffic on Snelling will be maintained with no detours. <br />Sustainability Update <br />• Partners in Energy <br />o The Center for Energy and Environment (CEE) with Neel Energy will present the <br />Energy Action Plan to Council on Monday June 21. Staff will provide an update to the <br />Commission during the meeting. <br />o To see information from the past meetings, visit www.CitvOfRoseville.com/Partners- <br />in-Energy. <br />