My WebLink
|
Help
|
About
|
Sign Out
Home
2021-05-25_PWETC_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Minutes
>
202x
>
2021
>
2021-05-25_PWETC_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 10:51:54 AM
Creation date
6/24/2021 10:51:38 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
5/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chair Wozniak opened up public comment. Seeing no one, public comment was <br />closed. He indicated that he has heard comments against revenue sharing and in <br />support of a 3.5-year contract. He indicated he would support continuation of the <br />current arrangement with bi-weekly pickup for single family and weekly pickup for <br />multi -family, which is base proposal 131, and Al has the lowest cost. <br />Member Cicha was in favor of proposer 2, IA. He noted this is lowest cost with <br />proposer two scoring higher on a lot of the scoring systems that have been set up to <br />help guide this decision. He thought the 3.5 term is right. <br />Motion <br />Member Cicha moved, Member Joyce seconded, to recommend the City <br />Council approve proposer 2 with proposal A-1 with a 3.5-year term. <br />Vice Chair Ficek noted on the ranking system proposer 2 did have the higher score <br />on the City's diversity, equity and inclusion which helped bring them to the top. <br />He also thought this recommendation and motion made sense from that standpoint. <br />Chair Wozniak concurred. He wondered if there was anything in the contract that <br />would allow the City to cancel the contract during the 3.5-year term. <br />Mr. Culver indicated there was not without cost. The City would have to identify <br />something that the proposer is not doing per contract and give them an opportunity <br />to remedy and if they do not then the contract could be cancelled. <br />Chair Wozniak indicated he cannot support revenue sharing at $75/ton so that <br />would take that off the table for him. If the City were able to negotiate a lower <br />processing fee it might be something worth looking at. He would also support <br />proposal A-1. <br />Ayes: 5 <br />Nays: 0 <br />Motion carried. <br />Mr. Culver asked if the Commission, given what is known now, support an increase <br />in the recycling fee so that the City can build up capital so that in three years the <br />City can buy their own carts and theoretically, at that point, have some more <br />competitive pricing. <br />Vice Chair Ficek indicated given the two proposals the City had varied in how they <br />approached the City owned cart; he did not know if he saw an advantage in it. If <br />they stayed with the same company and proposals would have come in the same <br />way the City would have had the advantage this round but given that it has not been <br />consistent, he did not know if that were the way he would go with this. <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.