My WebLink
|
Help
|
About
|
Sign Out
Home
2021_07-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_07-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 3:57:29 PM
Creation date
8/2/2021 3:54:54 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: July 27, 2021 <br />Item Description: Communication Items <br />Item No: 4 <br />Public Works Project updates: <br />• 2021 Pavement Management Project <br />o The contract was awarded to Bituminous Roadways, Inc. on April 12. Work consists of <br />8.7 miles of road resurfacing. Additionally, signal modifications to Snelling and Lydia <br />are included. A new pathway will also be installed on Rice Street between County <br />Road C2 and Woodlyn Avenue. <br />o Work began on June 7. Work on phases 1-3 are completed. Curb and utility work on <br />phases 4 and 6 are completed. Milling and paving on phases 4-6 will begin August 16 <br />and be completed by the end of the August. <br />o Work on the new Rice street pathway is scheduled to begin in early August once utility <br />conflicts are relocated. <br />o Work on the Snelling Avenue and Lydia modifications will begin the week of July 26. <br />Snelling Avenue will be reduced to one lane in each direction for up to one week. <br />Lydia Avenue will be closed at Snelling for up to one week. <br />o All work is expected to be completed by October. <br />County Road B Sewer Improvements <br />o Bids were opened on February 4 and the contract was awarded to SGP Contracting, Inc. <br />on February 22. Work involves repairing and upgrading the sanitary sewer system in <br />three locations on County Road B between Dale Street and Cohansey Street. The <br />project will be coordinated with Neel Energy's gas replacement project on County <br />Road B. Road closures and detours will be needed for the work and have been <br />communicated to residents and businesses in the area. Construction is anticipated to <br />begin on August 2 and last 3-4 weeks including the work of Neel Energy in the area. <br />Ramsey County Ditch 4 Storm Sewer & Twin Lakes Trail Improvements <br />o Bids were opened on March 15 and the contract was awarded to Meyer Contracting on <br />March 22. Work involves replacing the existing ditch with an 84" pipe, grading and <br />installing a 10-foot wide bituminous trail over the pipe, lighting, landscaping and tree <br />installation. All pipe work and major grading is completed. The trail and lighting work <br />will be ongoing. All work is scheduled to be completed by early September. <br />• 2021 Sewer Lining <br />o The contract was awarded to Visu-Sewer on November 30, 2020. The project consists <br />of lining 7.12 miles of pipe within the city. Work has been ongoing since December <br />and is 90% complete. All work is expected to be completed on the project by the end of <br />August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.