My WebLink
|
Help
|
About
|
Sign Out
Home
2021_08-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_08-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 11:23:17 AM
Creation date
8/24/2021 11:22:00 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other departments and organizations to find opportunities to partner on outreach <br />activities. <br />o More information can be found at www.CitvOfRoseville.com/Partners-in-Energy <br />Major Maintenance Activities: <br />• Street and Storm <br />o Completed crack sealing program 70,390 l.f. 27,OOOlbs of material. <br />o Paved first half of south Centre Pointe pathway. <br />o Milled, paved and striped Langton Lake west parking lot. <br />o Ongoing sidewalk panel grinding trip hazards. <br />o Ongoing pavement patching. <br />o Ongoing sign work. <br />o Ongoing catch basin repairs. <br />o Ongoing compost site maintenance and pile turning. <br />o Ongoing misc. tree work. Several responses, mostly fallen EAB branches. <br />o State Fair no parking signs prepped ready for install. <br />• Water and Sanitary Sewer <br />o Completed flushing and inspecting public hydrants. <br />o Painted 133 public hydrants. <br />o Repaired 10 hydrants. <br />o Created a process to enforce Watering Restrictions within the City of Roseville. <br />o Continued repairing water meters and MIUs. <br />o Continuing the process of collecting water service data and upgrading water meters and <br />MIUs in park buildings. <br />o Collected water samples for bacteriological testing. <br />o Continued with our annual valve exercising program (12" and larger). <br />o Continued the Sanitary Sewer Cleaning Program for 2021. <br />o Continued working with engineering staff and contractors for The Enclave at <br />McCarron's Lake and the 2021 PMP. <br />o Staff has finished working with MnDOT and their contractor on the 16" water main <br />replacement under the 35 W Bridge over County Road C and the Cleveland Avenue <br />Water Main Project. <br />o Continued working with AE2S on the 2021 SCADA System Upgrades. <br />o Continued laundering towels weekly used by office personnel for cleaning work areas. <br />o Repaired two broken water mains. <br />A: 2021 Roseville Project Map <br />B: August Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.